Safety Critical Element Management Manual


Figure 9: Example Operate phase performance standard template



Download 494.83 Kb.
View original pdf
Page20/54
Date16.09.2023
Size494.83 Kb.
#62078
1   ...   16   17   18   19   20   21   22   23   ...   54
Shell EP 2009.9009 SCE Management Manual
POSITION PAPER 130[shell verification]
Figure 9: Example Operate phase performance standard template
PS004 FIREWATER PUMPS
PERFORMANCE STANDARD OWNER Review By email
06/08/2008
Signed off
Date
Function no. Functional criteria
Minimum assurance task
Assurance measure Fire pump starts on demand Robert Baraciolli
BARRIER REFERENCE
SAFETY CRITICAL ELEMENT GROUP
PROTECTION SYSTEMS
Y/N
Assurance value
Y/N
Y/N
Each fire pump shall operate in accordance with its design characteristic.
Each fire pump shall start on demand from initiation signals.
Each pump shall be capable of running without interruption for the duration of a defined emergency event.
Control Room Fire and Gas Panel shall indicate Fire Pump status.
To supply combustion and cooling air to the diesel drivers associated with fire pumps.
1.1 Fire pump performance characteristic
Carry out performance test run of fire pump inline with the design pump curve to ensure capability to deliver the largest firewater demand.
2.1 Fire pump initiation test
The fire pumps shall start, upon receipt of start signal from Local panel pushbutton
• F&G panel pushbutton
• Fire main pressure switch
It is not necessary to test all three of the above during each test performance, but the testing regime shall ensure all start signals are tested equally.
3.1 Fire pump status indication
Initiation, and running, of the fire pumps shall be indicated on the control room fire and gas panel.
4.1 Fire pump HVAC
The dedicated fire pump HVAC systems shall be operable in terms of min/max temperature and air changes for the duration of the test.
Firewater discharge pressure
Firewater flow rate
>=(pressure)
>=(Flow) To provide firewater on demand to extinguish or limit the spread and effects of afire SCE GOAL
Fire pump running visible alarm
HVAC system operable
Operate phase performance standard template
5
Each pump shall be capable of running without interruption for the duration of a defined emergency event.