Seminar: Dod decision Support Systems Like Share Report 506 Views Download Presentation



Download 87.79 Kb.
Page32/91
Date18.03.2022
Size87.79 Kb.
#58458
1   ...   28   29   30   31   32   33   34   35   ...   91
DAU-DoD Decision Support Systems(PPT
Senior IAMD Systems Engineer, DoDAF资料全收集
Enclosure 5: OT&E • New section on SW testing requires plans for test automation starting at MS-A and a plan for use of software logs starting at MS-B • Demonstration of regression testing and SW maintenance at or before IOT&E • PMs for programs on the DOT&E Oversight list will designate a T&E WIPT (a.k.a. Integrated Test Team) as soon as practicable after the MDD • The TEMP is a signed contract among DT&E, the MDA, senior DoD leadership, the lead OTA, and the PM • The lead Operational Test Agency (OTA) will: • Prepare and report the results of at least one Early Operational Assessment (EOA) or Operational Assessment (OA) in support of one or more of the design phase life-cycle events (CDD Validation, Development RFP Release, or MS B) • EOA: An analysis of the program’s progress in identifying design constraints, developing capabilities, and mitigation program risks • OA: A test event conducted before initial production units are available and which incorporates substantial operational realism 43


  1. Download 87.79 Kb.

    Share with your friends:
1   ...   28   29   30   31   32   33   34   35   ...   91




The database is protected by copyright ©ininet.org 2024
send message

    Main page