Seminar: Dod decision Support Systems Like Share Report 506 Views Download Presentation



Download 87.79 Kb.
Page33/91
Date18.03.2022
Size87.79 Kb.
#58458
1   ...   29   30   31   32   33   34   35   36   ...   91
DAU-DoD Decision Support Systems(PPT
Senior IAMD Systems Engineer, DoDAF资料全收集
Enclosure 5: OT&E • T&E for Reliability Growth • Beginning at MS B…Include reliability growth and growth curves for the whole system and critical sub-systems/components • Growth curves will display planned initial reliability, the allocated requirement, expected reliability test results, and results to date • IOT&E for all programs will use production or production-representative test articles that, at a minimum, will incorporate the same parts and SW items to be used in LRIP articles. • DOT&E will evaluate whether proposed articles are production-representative • DOT&E submits a report to the SECDEF and Congress before programs under DOT&E oversight can proceed beyond LRIP • PMs for all programs may, with lead OTA coordination, elect to perform testing in conjunction with training or joint and operational exercises 44


  1. Download 87.79 Kb.

    Share with your friends:
1   ...   29   30   31   32   33   34   35   36   ...   91




The database is protected by copyright ©ininet.org 2024
send message

    Main page