Standing Operating Procedure (sop)



Download 1.29 Mb.
Page14/24
Date05.08.2017
Size1.29 Mb.
#26488
1   ...   10   11   12   13   14   15   16   17   ...   24




ENGINEER COURSES (CONT.)

Course Title/Number/MOS

FY 04

FY 05

FY 06

Remarks

DOD, Topographic Analyst, BNCOC 21U30, Ft. Belvoir, VA

**SEE NOTE








Pending TRADOC guidance

DOD, Topographic Surveyor, BNCOC 21S30, Ft. Belvoir, VA

**SEE NOTE








Pending TRADOC guidance

DOD, Photographic Cartographer, ANCOC, 21L40, Ft. Belvoir, VA

**SEE NOTE








Pending TRADOC guidance

DOD, Topographic Analyst, ANCOC 21U40, Ft. Belvoir, VA

**SEE NOTE








Pending TRADOC guidance

DOD, Topographic Surveyor, ANCOC 21S40, Ft. Belvoir, VA

**SEE NOTE








Pending TRADOC guidance

USAF Firefighter BNCOC, 21 M30, X3AZR3E 771-020, Sheppard AFB, TX

**SEE NOTE








Pending TRADOC guidance

USAF Firefighter ANCOC, 21 M40, X3AZR3E 771-023, Sheppard AFB, TX

**SEE NOTE








Pending TRADOC guidance

NOTES:
* - Courses implemented during mobilization only.

** - The TRADOC policy and Accreditation Standards Guide does not provide guidance on assessing and accrediting ITRO courses.

Appendix A, Section 2

Engineer School Distance Learning (DL) Modules/Phases

DISTANCE LEARNING ENGINEER MODULES/PHASES

Course Title/Number/

MOS/Hours

FY 04

FY 05

FY 06

Remarks

21B10 Combat Engineer (Reclass) (39.0 hrs)

Complete


2nd qtr







Completion scheduled for

FY 04. Evaluation implemented 6-12 months after graduates’ complete DL training.



21C10 TATS Bridge Crew Member (Reclass) (52.2 hrs)

Complete


2nd qtr




Completion scheduled for

FY 04. Evaluation implemented 6-12 months after graduates’ complete DL training.



21W10 Carpenter (23.0 hrs)

Implement

1st qtr








Completion scheduled for

FY 04. Evaluation implemented 6-12 months after graduates’ complete DL training.



21K10 Plumber/Utilitiesman (Reclass) (93.8 hrs)

Complete


2nd qtr




Completion scheduled for

FY 04. Evaluation implemented 6-12 months after graduates’ complete DL training.



21R10 Interior Electrician (Reclass) (44.0 hrs)

Complete


2nd qtr

Completion scheduled for

FY 04. Evaluation implemented 6-12 months after graduates’ complete DL training.



21T10 Technical Engineering Specialist (Reclass) (54 hrs)

Complete


2nd qtr




Completion scheduled for

FY 04. Evaluation implemented 6-12 months after graduates’ complete DL training.



62B10 Engineer Equipment Repairer (Reclass) (114.3 hrs)

Download 1.29 Mb.

Share with your friends:
1   ...   10   11   12   13   14   15   16   17   ...   24




The database is protected by copyright ©ininet.org 2024
send message

    Main page