Revision schedule
|
Rev
|
Date
|
Details
|
Prepared by
|
Reviewed by
|
Approved by
|
1
|
April 2014
|
First Draft
|
Craig Boorman
Assistant Hydrologist
Joanna Bolding
Assistant Hydrologist
|
Simon Keys
Associate EIA Project Manager
|
Simon Keys
Associate EIA Project Manager
|
2
|
July 2014
|
Draft for Consultation
|
Craig Boorman
Assistant Hydrologist
|
Simon Keys
Associate EIA Project Manager
|
Simon Keys
Associate EIA Project Manager
|
Limitations
Note to Authors:
This Limitations section must be included in all client reports.
Authors are required to complete this section by inserting the appropriate information in place of the bold text.
Towards the end of this section are five paragraphs enclosed in square brackets. These paragraphs should be included or removed as appropriate to the nature of our commission. When these paragraphs are being included, the square brackets should be removed.
No other changes are to be made to this section.
URS Infrastructure & Environment UK Limited (“URS”) and Capita Property and Infrastructure has prepared this Report for the sole use of Sutton Council (“Client”) in accordance with the Agreement under which our services were performed (3113187, April 2013). No other warranty, expressed or implied, is made as to the professional advice included in this Report or any other services provided by URS. This Report is confidential and may not be disclosed by the Client nor relied upon by any other party without the prior and express written agreement of URS.
The conclusions and recommendations contained in this Report are based upon information provided by others and upon the assumption that all relevant information has been provided by those parties from whom it has been requested and that such information is accurate. Information obtained by URS has not been independently verified by URS, unless otherwise stated in the Report.
The methodology adopted and the sources of information used by URS in providing its services are outlined in this Report. The work described in this Report was undertaken between November 2013 and July 2014 and is based on the conditions encountered and the information available during the said period of time. The scope of this Report and the services are accordingly factually limited by these circumstances.
Where assessments of works or costs identified in this Report are made, such assessments are based upon the information available at the time and where appropriate are subject to further investigations or information which may become available.
URS disclaim any undertaking or obligation to advise any person of any change in any matter affecting the Report, which may come or be brought to URS’ attention after the date of the Report.
Certain statements made in the Report that are not historical facts may constitute estimates, projections or other forward-looking statements and even though they are based on reasonable assumptions as of the date of the Report, such forward-looking statements by their nature involve risks and uncertainties that could cause actual results to differ materially from the results predicted. URS specifically does not guarantee or warrant any estimate or projections contained in this Report.
Costs may vary outside the ranges quoted. Whilst cost estimates are provided for individual issues in this Report these are based upon information at the time which can be incomplete. Cost estimates for such issues may therefore vary from those provided. Where costs are supplied, these estimates should be considered in aggregate only. No reliance should be made in relation to any division of aggregate costs, including in relation to any issue, site or other subdivision.
Copyright
© This Report is the copyright of URS Infrastructure & Environment UK Limited. Any unauthorised reproduction or usage by any person other than the addressee is strictly prohibited.
Project Number
47069163
Contact Details
URS Infrastructure and Environment UK Ltd
6-8 Greencoat Place
London
SW1P 1PL
United Kingdom
Telephone: +44(0)20 7798 5000
Fax: +44(0)20 7798 5001
TABLE OF CONTENTS
1Non technical summary 1
2introduction 3
1.1Background 3
1.2South West London Flood Group 3
1.3Strategic Environmental Assessment 4
1.4Structure of the Environmental Report 4
3Consultation 5
1.5Development from Scoping Report 6
1.6Dealing with Uncertainties 6
4sea methodology 8
1.7Purpose of SEA 8
1.8Stages of the SEA 8
5LFRMS for The London Borough of Sutton 10
1.9Technical Scope 10
1.10Relationship with other Flood Risk Plans and Assessments 10
1.11Aim, Objectives and Measures 10
6Sustainability contexT 12
1.12Introduction 12
1.13Review of related plans, programmes and strategies 12
1.14Water Framework Directive (WFD) Assessment 13
1.15Habitat Regulation Assessment 14
1.16Identification of Key Themes 14
7SEA Baseline INFORMATION 15
1.17Introduction 15
1.18Summary of Flood Risk in LB Sutton 15
1.19Summary of Baseline Information 15
1.20Likely influence of Strategy 18
8SEa approach 20
1.21Initial SEA Objectives 20
1.22SEA Objectives 23
1.23Assessment Approach 24
9assessment of strategy objectives and alternatives 26
1.24Introduction 26
1.25Timescale 26
1.26Developing strategic alternatives 26
1.27Assessment of objectives 26
1.27.1Assessment Summary 29
1.27.2Direct Impacts 29
1.27.3Indirect Impacts 29
1.28Assessment of alternatives 31
1.28.1Assessment Summary 34
1.28.2Direct Impacts 34
1.28.3Indirect Impacts 34
1.29Assessment of cumulative effects 35
1.29.1Assessment Summary 36
10conclusions and monitoring 38
1.30Conclusion 38
1.31Mitigation 38
1.32Proposed Monitoring 38
APPENDIX A – POLICY CONTEXT REVIEW 41
APPENDIX B – SCOPED IN TOPICS AND SUSTAINABILITY THEMES 62
APPENDIX C – OVERALL ENVIRONMENTAL BASELINE 67
APPENDIX D – CONSULTATION RESPONSES 81
List of Figures
Figure 2.1: Study Area consisting of the six London Boroughs of Richmond Upon Thames, Wandsworth, Merton, Kingston Upon Thames, Sutton and Croydon 3
Figure 4.2: Relationship between SEA stages. 9
Figure 8.3: SEA Scoping objectives to final SEA objectives flow chart 21
List of Tables
Table 2.1: Requirements of the SEA Directive (Annex I) 4
Table 6.2: Summary of relevant plans, programmes and policies 12
Table 7.3: Updated Scoping outcomes for Environmental Topics 15
Table 7.4: Summary of LB Sutton Baseline 16
Table 8.5: SEA Objectives 23
Table 8.6: Strategy objective impacts description 25
Table 9.7: Compatibility and assessment of the Strategy objectives against the SEA objectives 28
Table 9.8: Assessment of the ‘do nothing’ alternative against the SEA objectives 32
Table 10.9: Proposed indicators for monitoring the potential significant and uncertain environmental effects of the Strategy 39
Table C.10: Population change and population projections per Borough 67
Table C.11: Condition of Designated Areas that could be affected by the Strategies 68
Table C.12: Number of locally important designated sites 69
Table C.13: London regional BAP Habitats present in each Borough 70
Table C.14: Relevant Water Framework Directive surface waterbodies status and objectives’ 72
Share with your friends: |