179 Model Comparison for Crew Crew 1 Model I Output
Model II Output Reg eqn 27.063+1.853T+26.006D-1.067SC Reg eqn D Predictor
Coef Std.
Error t p Predictor Coef Std. Error t p
Constant 27.063 1.935 13.987 0 Constant
33.547 1.392 24.095 0 Time
1.853 0.497 3.729 0.003 DD SC
-1.067 0.547
-1.95 0.075 Std. Error of est.
2.07833 Std. Error of est.
3.41039
R-sq
99.00%
R-sq
96.80%
R-sq (adj)
98.70%
R-sq (adj)
96.50%
SS
Reg
4978.11
SS
Reg
4867.11
MS
Res
4.32
Durbin-Watson
2.874
Durbin-Watson
1.416 d
L
0.857
The errors of the model are independent. d
L
1.106
The errors of the model are independent. d
U
1.728 d
U
1.371
HM test -1.0655 HM test
1.0103 p-value
0.2866 p-value
0.315
Cutting Cranes div
180
Model Comparision test
((Ss
Reg Model I- SSRegModel II)/2)/MS
Reg Model I (F
obt.
)
2.8068 F
critical
Thus Model I is appropriate.
The level change coefficient 26.006 The change is statistically significant p < 0.05 95% confidence interval on
level change 21.021 30.992
Standardized level change
12.51359
Confidence and Prediction Interval
181 Test for Homoscedasticity and Linearity Test
for Normality of Residuals
182
Share with your friends: