Supplementary Information



Download 1.58 Mb.
Page7/12
Date26.11.2017
Size1.58 Mb.
#35345
1   2   3   4   5   6   7   8   9   ...   12

The total volume of melt production , per unit time per unit length of the ridge , at an along axis location y0 , was computed by integrating equation (9), over the cross-sectional area R in which melting occurs (i.e. over the region where is positive):

(10)

The crustal thickness Hc is:



Download 1.58 Mb.

Share with your friends:
1   2   3   4   5   6   7   8   9   ...   12




The database is protected by copyright ©ininet.org 2024
send message

    Main page