Table of contents exchange of letters with the minister executive summary



Download 5.91 Mb.
View original pdf
Page19/329
Date27.11.2023
Size5.91 Mb.
#62728
1   ...   15   16   17   18   19   20   21   22   ...   329
Report of the COI into the Cyber Attack on SingHealth 10 Jan 2019

COI Report – Part II
Page 8 of 425

Part II – Background information relevant
to the Inquiry
TABLE OF CONTENTS – PART II
5
INTRODUCTION TO THIS PART. 10
6
ROLES OF MOH, MOHH, SINGHEALTH AND IHIS IN IT
ADMINISTRATION FOR THE PUBLIC HEALTHCARE SECTOR ............... 10
6.1
The Ministry of Health (MOH) – Healthcare sector regulator ...................... 10 6.2
MOH Holdings (MOHH) – Operating arm of MOH, in charge of infrastructure for public healthcare ................................................................ 11 6.3
SingHealth – Healthcare Cluster and legal owner of SCM system ............... 13 6.4
IHiS – Healthcare Sector Lead and central IT agency for the public healthcare system ........................................................................................... 13
6.4.1
Consolidation of public healthcare system’s IT function under IHiS ............... 14
6.4.2
Scope and scale of IHiS’ IT operations ............................................................ 16
7
THE SUNRISE CLINICAL MANAGER SYSTEM ...................................... 17
7.1
Overview of the SCM system ........................................................................ 17 The SingHealth SCM database ...................................................................... 17 User access to SCM and the SCM database .................................................. 18
8
PARTS OF THE SCM SYSTEM AND NETWORK RELEVANT TO THE
CYBER ATTACK ...................................................................................................... 20
8.1
Overview ........................................................................................................ 20 8.2
SCM application and database servers .......................................................... 21 8.3
Citrix servers .................................................................................................. 21 Migration of the SCM to H-Cloud and open network connection between
SGH and HDC ............................................................................................... 21

Download 5.91 Mb.

Share with your friends:
1   ...   15   16   17   18   19   20   21   22   ...   329




The database is protected by copyright ©ininet.org 2024
send message

    Main page