The History of the Canadian Navy in New Brunswick



Download 1.65 Mb.
Page5/6
Date28.03.2018
Size1.65 Mb.
#43614
1   2   3   4   5   6

Source: http://www.navy.forces.gc.ca/fredericton/7/7-s_eng.asp?keyword=[05-337

Nine of the twelve ships of the Halifax Class Frigate Program were constructed at Saint John Shipbuilding Ltd. in Saint John and three ships were constructed at Davie Shipbuilding in Lauzon, Quebec. The photos above were taken during the construction of HMCS Fredericton.


  • Name 10 jobs that would have been needed during the construction of these ships.

  • What economic benefits besides direct jobs would have come to New Brunswick due to this project?

  • The late 1990s saw Saint John Shipbuilding left with little work after the Halifax Class frigates were completed. Finally, in 2003, it closed its doors. Outline the benefits and costs for a shipyard in obtaining a large project such as the Frigate Program.




Download 1.65 Mb.

Share with your friends:
1   2   3   4   5   6




The database is protected by copyright ©ininet.org 2024
send message

    Main page