The ministry of economic development of the republic of azerbaijan rehabilitation and closure of unauthorized dump sites in the greater baku area environmental



Download 4.64 Mb.
Page42/82
Date06.08.2017
Size4.64 Mb.
#27742
1   ...   38   39   40   41   42   43   44   45   ...   82

1.29Site 33




Unauthorised Dumpsites Questionnaire - Greater Baku Area




Dumpsite Code

33




Person who conducted the survey

Prof. Dr. Theologos Mimidis




Date of the survey

19/01/2011

1

Name of dumpsite

Primorsk beach

2

Coordinates

40 13 30,2

49 32 28,5



3

Settlements which use the dumpsite

New beach settlement (Yeni Sahil)

4

Municipality (-ies) or local authority (-ies) which use the dumpsite

Municipality of Garadagh

5

General description of the situation in the dumpsite

Very big area with low relief hills – old quarry of earthy materialas

6

Total years of operation of the dumpsite

20

7

Date of initiation

1991

8

Date of closure

-

9

Years after closure (<15, 15< and <40, >40)

-

10

Area of dumpsite (in 1.000m2)

1000 m x 500 m = 500,000 m2

11

Type of waste disposed (define with percentages)

60% household and domestic waste, 30% construction , demolition and rubble, 5% sludge, 3% metallic, 2% old tires (H)

12

Municipal waste, wastewater treatment sludge, sewage water

Yes, yes, no

13

Inert and bulky

Yes

14

Green and agricultural

Green: pastures, agricultural: no

15

Medical waste, toxic waste, slaughter house waste

No, very small quantities of toxic and slaughter (<0.5%)

16

Other (describe)

The dumpsite is used by cows as a grazing place

17

Total volume (m3)

500,000 m2 x 0,5 m = 250,000 m3

18

Total quantity (tn)

80,000 tn

19

Disposal method (describe: dispersion, incineration, compaction, temporary cover frequency)

Dispersion, incineration, compaction and temporary cover not very frequently

20

Quantity of gas generated

Medium quantity

21

Bedrock (main formation)

Shelly limestone with sands (Upper Quartenary)

22

Morphology of area (stream, valley, mountainside, level area, pit, quarry, other)

Formal quarry with low relief hills

23

Hydraulic conductivity of capping (impermeable, moderate, free flow)

-

24

Hydraulic conductivity of bedrock (impermeable, moderate, free flow)

Permeable

25

Distance from the aquifer (>10m, 2-10m, <2m, in the aquifer)

< 2 m

26

Site Distance from:

I

27

Settlements, schools, working places

2 km from settlements, schools and working places

28

Stream with permanent flow

No

29

Forest

No

30

Agricultural activities, pastures

No, yes

31

Wells / boreholes

Yes

32

Sea shore

1.5 km

33

Other (describe)

1.2 km from Garadagh cement factory and 3.2 km from mud flow volcanoes

34

Existing infrastructure

M3 motorway, pipes of gas, oil and water

35

Fencing

No

36

Guard-house

No

37

Lining or collection of leachate

No

38

Fire safety measures - fire belt

No

39

Other (describe)

One of the 15 biggest dumpsites, near a summer resort

40

Nuisances and Hazards

Yes

41

Odors and dust

Yes

42

Wind blown materials

Yes

43

Birds, rats, vermin, insects

Yes

44

Fires

Yes

45

Rainfall values (<100mm, 100-200mm, >200mm)

100 – 250 mm

46

Stream flow (if applicable) through the site

No

47

Flood potential (1 in 10yrs, 1 in 50, 1 in 100)

1 in 10 years

48

Use of the receptor (no use, irrigation, drinking-recreation)

A costal aquifer not in use

49

Sensitivity of the receptor (low, medium, high)

High

50

Expected impacts on the environment (e.g. odours, pollution of receptors, fires etc)

High

51

Other information

Danger for mud flow hazardous flooding



Photograph 29: Site 33



Download 4.64 Mb.

Share with your friends:
1   ...   38   39   40   41   42   43   44   45   ...   82




The database is protected by copyright ©ininet.org 2024
send message

    Main page