The ministry of economic development of the republic of azerbaijan rehabilitation and closure of unauthorized dump sites in the greater baku area environmental



Download 4.64 Mb.
Page58/82
Date06.08.2017
Size4.64 Mb.
#27742
1   ...   54   55   56   57   58   59   60   61   ...   82

1.45Site 53




Unauthorised Dumpsites Questionnaire - Greater Baku Area




Dumpsite Code

53




Person who conducted the survey

Prof. Dr. Theologos Mimidis




Date of the survey




1

Name of dumpsite

Bulbul lake, north coast

2

Coordinates

40 26 03,0

49 57 53,2



3

Settlements which use the dumpsite

Razin

4

Municipality (-ies) or local authority (-ies) which use the dumpsite

Municipality of Surakhani

5

General description of the situation in the dumpsite

Next to cemetery and sewage pumping station co-disposal sites

6

Total years of operation of the dumpsite

10

7

Date of initiation

1999

8

Date of closure

2010

9

Years after closure (<15, 15< and <40, >40)

1

10

Area of dumpsite (in 1.000m2)

300 m x 150 m = 45,000 m2

11

Type of waste disposed (define with percentages)

50% household, 20% construction and demolition blocks, 5% metal, 5% plastic, 20% wood (M+I)

12

Municipal waste, wastewater treatment sludge, sewage water

Yes, yes ,yes

13

Inert and bulky

No

14

Green and agricultural

Yes

15

Medical waste, toxic waste, slaughter house waste

No, yes, yes

16

Other (describe)

Dogs and birds everywhere around

17

Total volume (m3)

45000m2 x 1m = 45,000 m3

18

Total quantity (tn)

15,000 tn

19

Disposal method (describe: dispersion, incineration, compaction, temporary cover frequency)

Deposition, temporary cover

20

Quantity of gas generated

High

21

Bedrock (main formation)

Limestone, sands with clay interbeds (Upper Pliocene), aquifer

22

Morphology of area (stream, valley, mountainside, level area, pit, quarry, other)

Flat and area hilly nearby lake

23

Hydraulic conductivity of capping (impermeable, moderate, free flow)

-

24

Hydraulic conductivity of bedrock (impermeable, moderate, free flow)

Moderate

25

Distance from the aquifer (>10m, 2-10m, <2m, in the aquifer)

<2 m

26

Site Distance from:

S

27

Settlements, schools, working places

100 m , 50 m , 200m

28

Stream with permanent flow

200

29

Forest

100 m

30

Agricultural activities, pastures

No

31

Wells / boreholes

No

32

Sea shore

8.3 km

33

Other (describe)

50 m from the cemetery developed in a very big grove

34

Existing infrastructure

Town infrastructure with sewage pumping station

35

Fencing

Yes

36

Guard-house

Yes

37

Lining or collection of leachate

No

38

Fire safety measures - fire belt

Yes

39

Other (describe)

Among the 15 largest dump sites

40

Nuisances and Hazards

Yes

41

Odors and dust

Yes

42

Wind blown materials

Yes

43

Birds, rats, vermin, insects

Yes

44

Fires

Yes

45

Rainfall values (<100mm, 100-200mm, >200mm)

100 – 250 mm

46

Stream flow (if applicable) through the site

Yes

47

Flood potential (1 in 10yrs, 1 in 50, 1 in 100)

1 in 10 yrs

48

Use of the receptor (no use, irrigation, drinking-recreation)

Aquifer not in use

49

Sensitivity of the receptor (low, medium, high)

High

50

Expected impacts on the environment (e.g. odours, pollution of receptors, fires etc)

High

51

Other information

Completely extinction of water life (flora and fauna)



Photograph 45: Site 53


Download 4.64 Mb.

Share with your friends:
1   ...   54   55   56   57   58   59   60   61   ...   82




The database is protected by copyright ©ininet.org 2024
send message

    Main page