The ministry of economic development of the republic of azerbaijan rehabilitation and closure of unauthorized dump sites in the greater baku area environmental



Download 4.64 Mb.
Page65/82
Date06.08.2017
Size4.64 Mb.
#27742
1   ...   61   62   63   64   65   66   67   68   ...   82

1.52Site 61




Unauthorised Dumpsites Questionnaire - Greater Baku Area




Dumpsite Code

61




Person who conducted the survey

Prof. Dr. Theologogos Mimides




Date of the survey

30/3/2011

1

Name of dumpsite

International Bus Station

2

Coordinates

40°24'34.98"N

49°47'21.84"E



3

Settlements which use the dumpsite

Alatava 2, Binagadi settlements and refugee settlement inside the site

4

Municipality (-ies) or local authority (-ies) which use the dumpsite

Municipality of Binagadi

5

General description of the situation in the dumpsite

500 m from the new road, drainage pipes from the new road, raw sewage waste water from the refugee and Alatava 2 settlement discharging into the dumpsite creating pools with stagnant waste water

6

Total years of operation of the dumpsite

20

7

Date of initiation

1991

8

Date of closure

-

9

Years after closure (<15, 15< and <40, >40)

-

10

Area of dumpsite (in 1.000m2)

60,000 m2

11

Type of waste disposed (define with percentages)

10% construction and rubble, 5% household, 84% tree trimming waste from the metropolitan area of Baku, 1% other (car scraping)

12

Municipal waste, wastewater treatment sludge, sewage water

Yes, yes, yes

13

Inert and bulky

No

14

Green and agricultural

Yes

15

Medical waste, toxic waste, slaughter house waste

No, no, no

16

Other (describe)

Small cane pools containing shallow ground water and rainfall water

17

Total volume (m3)

60,000 x 0,4 = 24,000 m3

18

Total quantity (tn)

8,000 tn

19

Disposal method (describe: dispersion, incineration, compaction, temporary cover frequency)

Dispersion, at places incineration

20

Quantity of gas generated

No

21

Bedrock (main formation)

Limestone, sand with clay interbeds, aquifer, Upper Pliocene

22

Morphology of area (stream, valley, mountainside, level area, pit, quarry, other)

Stream

23

Hydraulic conductivity of capping (impermeable, moderate, free flow)

No capping

24

Hydraulic conductivity of bedrock (impermeable, moderate, free flow)

Moderate

25

Distance from the aquifer (>10m, 2-10m, <2m, in the aquifer)

< 2 m

26

Site Distance from:




27

Settlements, schools, working places

540 m, 1.6 Km, 250 m

28

Stream with permanent flow

Yes

29

Forest

Yes

30

Agricultural activities, pastures

Yes, Yes

31

Wells / boreholes

Yes (500 m)

32

Sea shore

6.4 Km

33

Other (describe)

250 m from Olympic Shooting Federation

34

Existing infrastructure

4 pipes of water and gas (building of gas station)

35

Fencing

No

36

Guard-house

No

37

Lining or collection of leachate

No

38

Fire safety measures - fire belt

No

39

Other (describe)

4 refugee families live inside the dumpsite

40

Nuisances and Hazards

No

41

Odors and dust

No

42

Wind blown materials

No

43

Birds, rats, vermin, insects

No

44

Fires

Yes at places

45

Rainfall values (<100mm, 100-200mm, >200mm)

175 mm

46

Stream flow (if applicable) through the site

Yes

47

Flood potential (1 in 10yrs, 1 in 50, 1 in 100)

1 in 10 years

48

Use of the receptor (no use, irrigation, drinking-recreation)

No use

49

Sensitivity of the receptor (low, medium, high)

Medium

50

Expected impacts on the environment (e.g. odours, pollution of receptors, fires etc)

Medium

51

Other information

700 m from Hagihasan Lake




Photograph 60: Site 61


Download 4.64 Mb.

Share with your friends:
1   ...   61   62   63   64   65   66   67   68   ...   82




The database is protected by copyright ©ininet.org 2024
send message

    Main page