The ministry of economic development of the republic of azerbaijan rehabilitation and closure of unauthorized dump sites in the greater baku area environmental



Download 4.64 Mb.
Page71/82
Date06.08.2017
Size4.64 Mb.
#27742
1   ...   67   68   69   70   71   72   73   74   ...   82

1.58Site 67




Unauthorised Dumpsites Questionnaire - Greater Baku Area




Dumpsite Code

67




Person who conducted the survey

Pr. Dr. Theologos Mimides




Date of the survey

31/3/2001

1

Name of dumpsite

Buzovna settlement

2

Coordinates

40°31'3.72"N

50° 7'35.22"E



3

Settlements which use the dumpsite

Buzovna

4

Municipality (-ies) or local authority (-ies) which use the dumpsite

Khazar

5

General description of the situation in the dumpsite

A characteristic dumpsite near a resort and a sea lake replacing its water from sea tides

6

Total years of operation of the dumpsite

10

7

Date of initiation

2001

8

Date of closure

-

9

Years after closure (<15, 15< and <40, >40)

-

10

Area of dumpsite (in 1.000m2)

1,500 m2

11

Type of waste disposed (define with percentages)

70% construction, rubble, demolition, including roof protection tar waste, 25% household, 5% trimmings

12

Municipal waste, wastewater treatment sludge, sewage water

Yes, no ,no

13

Inert and bulky

Yes

14

Green and agricultural

Yes, yes

15

Medical waste, toxic waste, slaughter house waste

No, no ,no

16

Other (describe)

Illegal grazing of sheep and goats

17

Total volume (m3)

1,500 m2 x 4.5 m = 6,750 m3

18

Total quantity (tn)

2,250 tn

19

Disposal method (describe: dispersion, incineration, compaction, temporary cover frequency)

Deposition and incineration. Compaction and temporary cover

20

Quantity of gas generated

Small

21

Bedrock (main formation)

Shelly limestone and sands (Upper Quartenary)

22

Morphology of area (stream, valley, mountainside, level area, pit, quarry, other)

Lake shore of very low relief

23

Hydraulic conductivity of capping (impermeable, moderate, free flow)

The half of the area is capped – free flow

24

Hydraulic conductivity of bedrock (impermeable, moderate, free flow)

Moderate

25

Distance from the aquifer (>10m, 2-10m, <2m, in the aquifer)

< 2m

26

Site Distance from:




27

Settlements, schools, working places

80 m ,850 m, 130 m and 210 m from a mosque

28

Stream with permanent flow

No

29

Forest

Yes

30

Agricultural activities, pastures

Yes, yes

31

Wells / boreholes

A groundwater well at a distance of 50 m

32

Sea shore

570 m

33

Other (describe)

Grazing pastures for sheep and caws. Caw stables and caw manure have been noticed in many places outside houses

34

Existing infrastructure

Gas and water pipe

35

Fencing

Partially fenced

36

Guard-house

No

37

Lining or collection of leachate

No

38

Fire safety measures - fire belt

No

39

Other (describe)

Ground water pits for animal watering

40

Nuisances and Hazards

No

41

Odors and dust

Yes (smell of hydrocarbons)

42

Wind blown materials

Yes

43

Birds, rats, vermin, insects

Yes

44

Fires

Yes

45

Rainfall values (<100mm, 100-200mm, >200mm)

50 mm

46

Stream flow (if applicable) through the site

No

47

Flood potential (1 in 10yrs, 1 in 50, 1 in 100)

1 in 50 years

48

Use of the receptor (no use, irrigation, drinking-recreation)

Irrigation and animal waterin

49

Sensitivity of the receptor (low, medium, high)

High

50

Expected impacts on the environment (e.g. odours, pollution of receptors, fires etc)

Medium

51

Other information

Manure to be collected on a regular basis from the streets of the village and transferred to the dumpsite




Photograph 66: Site 67


Download 4.64 Mb.

Share with your friends:
1   ...   67   68   69   70   71   72   73   74   ...   82




The database is protected by copyright ©ininet.org 2024
send message

    Main page