SME – If a reference is listed in the conditions then you agree that the Soldier MUST actually have the reference in his hand to perform this task. Ref #_______________________
|
NA / Y
|
SME – Is this standard how you would measure if the Soldier is able to perform this task? Does it describe how well, completely, or accurately a Soldier must be able to perform the task in the field? Is the standard written in present tense?
Are there time restrictions? Does it have to be performed in sequence?
|
Y
Y
Y / N
|
ALL – There is a performance step or sub-step for each item listed in the standard.
|
Y
|
1750 (Training Developer) – All steps are performance oriented and are performed by the one person performing the task.
|
Y
|
1750 – Each step begins with an action verb and concerns one action only.
|
Y
|
ALL – The steps and sub-steps are present tense and listed in the order performed or in a logical order?
|
Y
|
ALL – The sub-steps describe how to perform the step they are associated with.
|
Y
|
1750 – All risks, hazards, and related actions are listed as cautions or warnings.
|
Y
|
1750 – All notes are notes (things you need to know: just information).
|
Y
|
1750 – All cautions are cautions (possible damage to equipment).
|
Y
|
1750 – All warnings are warnings (possible injury or death).
|
Y
|
ALL – Notes, cautions and warnings are linked to the appropriate step: if applicable to more than one step, listed at the beginning of the performance steps or as an outline note.
|
Y
|
ALL – The references listed are the appropriate and current references for this task.
|
Y
|
SME – GO/NO GO performance measures for evaluating a Soldier are listed.
|
Y
|
1750- Verified that performance measures and steps match up.
|
Y
|
1750 – Performance measures are written in past tense, begin with a verb and provide criteria for performance.
|
Y
|
1750 – The Evaluation Guidance statement indicates the requirements for receiving a GO on the evaluation and contains remedial training tips for retraining Soldiers who receive a NO GO on the task.
|
Y
Y
|
ALL – Evaluation Preparation tab contains an evaluation statement.
|
Y
|
ALL – All acronyms were spelled out the first time they were used.
|
Y
|
Verified each of the following are filled in:
Task Data Tab – all parts – Individual Task Manager
Administrative Tab: identify both the POC and the Analyst/SME – ALL
Equipment Tab (must track w/equipment in conditions statement) – SME
Related Tasks Tab – must include one supported collective task: verify all. – SME
Environmental and Safety Tabs (Under Considerations/Notes) – ALL
Occupations Tab to MOS links tab – Individual Task Manager input/SME verify
Military Personnel Classification __ AOC/MOS
Occupational Specialty __ Skill Level/Rank
Primary MOS (yes or no) __ Sustainment Frequency
Initial Training Location (pick list)
STP/Subject Area Tab – Initial Training Developer w SMEs/SMEs verify when reviewing task
Product ID __ Product Name __ Subject Area (pick list)
Supporting Products Tab
All relevant references are listed – SME
All references listed include complete title & # and are current – ALL
___Select required or related for each reference – SME
Verified that multimedia is clear, relevant and is linked to the appropriate step – ALL
|
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
|
ALL- Change history comments enable others to know what changed.
|
Y
|
ALL - Ran spell check and removed all illegal characters \, {,}, and &.
|
Y
|
ALL - Read through the task after making revisions to verify the task is accurate.
|
Y
|