Unit assessment pack (uap)


Activity 2: Prepare schema



Download 199.66 Kb.
Page34/40
Date18.05.2021
Size199.66 Kb.
#56667
1   ...   30   31   32   33   34   35   36   37   ...   40
Unit Assessment Pack ICTICT502 -Unit Assessment Pack V1.2 June 2020
Activity 2: Prepare schema

  1. Analyse and document component connectivity

  1. Determine the specific components for component diagram.

  2. Analyse and document the component connectivity based upon the information provided in the case study scenario.

  1. Identify and incorporate data flow iteration

  1. Identify and document the data flow analysis

  2. Identify processes and data flow between the different components.

  1. Prepare component action diagrams according to standards

  1. Develop component action diagrams according to standards (any four) .

  2. Component action diagram must include:

        1. Action

        2. Decision node

        3. Control flows

        4. Start node

        5. End node


Download 199.66 Kb.

Share with your friends:
1   ...   30   31   32   33   34   35   36   37   ...   40




The database is protected by copyright ©ininet.org 2024
send message

    Main page