Acac cns/atm study Update & Strategic Planning Supplemental Data Collection Questionnaire Project Manager


FIR ASBU Block 0, 1, 2, and 3 Progression (AS)



Download 2.67 Mb.
Page6/26
Date02.02.2017
Size2.67 Mb.
#15945
1   2   3   4   5   6   7   8   9   ...   26

5FIR ASBU Block 0, 1, 2, and 3 Progression (AS):


Please provide the following FIR ASBU Block 0, 1, 2, and 3 status and progression information:

SAMPLE - (AS-1): Indicate the status of the FIR’s compliance with ASBU Block 0 objectives. Insert your response using the following criteria:

FIFully Implemented

PI (%) – Partially Implemented, include approximate percentage of completion

NI – Not Implemented

NA – Not Applicable

(Note- The sample responses are depicted in Blue font)



ASBU Block 0 – Sample

Table : AS-1, Sample, ASBU Block 0

Performance Improvement Area

Block 0 Module (2013)

Status

(FI, PI%, NI, NA)

Airport Operations

Improved Airport Operations through Airport-CDM

PI (25%)

Target

Progress Towards Implementation

Remarks

40% by December 2017

Airport Collaborative Decision Making (A-CDM) will be progressively built in connection with the expansion and modernization of Muscat and Salalah airports.

Implementation of Advanced CDM –is planned for Oman airports which will increase collaboration between airport partners by utilizing advanced technologies and linking with advanced tools, (A-SMGCS, AMAN / DMAN)



5.1ASBU Block 0


Please provide the following FIR ASBU Block 0, 1, 2, and 3 status and progression information:
(AS-1): Indicate the status of the FIR’s compliance with ASBU Block 0 objectives. Insert your response using the following criteria:

FI – Fully Implemented

PI (%) – Partially Implemented, include approximate percentage of completion

NI – Not Implemented

NA – Not Applicable
Insert Response Here:

Table : AS-1, ASBU Block 0



Performance Improvement Area

Block 0 Module (2013)

Status

(FI, PI%, NI, NA)

Airport Operations

Optimized Approach Procedures including Vertical Guidance




Target

Progress Towards Implementation

Remarks










Increased Runway Throughput through Optimized Wake Turbulence Separation




Target

Progress Towards Implementation

Remarks










Safety and Efficiency of Surface Operations (A-SMGCS level 1-2)




Target

Progress Towards Implementation

Remarks










Improved Airport Operations through Airport-CDM




Target

Progress Towards Implementation

Remarks










Improve Traffic Flow through Sequencing (AMAN/DMAN)




Target

Progress Towards Implementation

Remarks










Globally Interoperable Systems and Data

Increased Interoperability, Efficiency and Capacity through Ground-Ground Integration




Target

Progress Towards Implementation

Remarks










Service Improvement through Digital Aeronautical Information Management




Target

Progress Towards Implementation

Remarks










Meteorological Information Supporting Enhanced Operational Efficiency and Safety




Target

Progress Towards Implementation

Remarks










Optimum Capacity and Flexible Flights

Improved Operations through Enhanced En-route Trajectories




Target

Progress Towards Implementation

Remarks










Improved Flow Performance through Planning based on a Network-wide view




Target

Progress Towards Implementation

Remarks










Initial Capability for Ground Surveillance




Target

Progress Towards Implementation

Remarks










Air Traffic Situational Awareness (ATSA)




Target

Progress Towards Implementation

Remarks










Improved Access to Optimum Flight Levels through Climb/Descent Procedures using ADS-B




Target

Progress Towards Implementation

Remarks










Airborne Collision Avoidance Systems (ACAS) Improvements




Target

Progress Towards Implementation

Remarks










Increased Effectiveness of Ground-Based Safety Nets




Target

Progress Towards Implementation

Remarks










Efficient Flight Path

Improved Flexibility and Efficiency in Descent Profiles using Continuous Descent Operations (CDO)




Target

Progress Towards Implementation

Remarks










Improved Safety and Efficiency through the Initial Application of Data Link EnRoute




Target

Progress Towards Implementation

Remarks










Improved Flexibility and Efficiency Departure Profiles — Continuous Climb Operations (CCO)




Target

Progress Towards Implementation

Remarks











(AS-1-1): Identify any limitation(s) in meeting ICAO ASBU 0 objectives.

Insert Response Here:
(AS-1-2): Additional comments, as appropriate.

Insert Response Here:

(AS-2): Indicate the status of the FIR’s compliance with ASBU Block 1 objectives. Insert your response using the following criteria:

FI – Fully Implemented

PI (%) – Partially Implemented, include approximate percentage of completion

NI – Not Implemented

NA – Not Applicable

Insert Response Here:

Table : AS-2, ASBU Block 1



Performance Improvement Area

Block 1 Module (2018)

Status

(FI, PI%, NI, NA)

Airport Operations

Optimized Airport Accessibility




Target

Progress Towards Implementation

Remarks










Increased Runway Throughput through Optimized Wake Turbulence Separation




Target

Progress Towards Implementation

Remarks










Enhanced Safety and Efficiency of Surface Operations — Surf, Surf-1A, and Enhanced Vision Systems (EVS)




Target

Progress Towards Implementation

Remarks










Optimized Airport Operations through A-CDM Total Airport Management




Target

Progress Towards Implementation

Remarks










Improved Airport Operations through Departure, Surface and Arrival Management




Target

Progress Towards Implementation

Remarks










Remotely Operated Aerodrome Control




Target

Progress Towards Implementation

Remarks










Globally Interoperable Systems and Data

Increased Interoperability, Efficiency and Capacity through FF-ICE/1 application before Departure




Target

Progress Towards Implementation

Remarks










Service Improvement through Integration of all Digital ATM Information




Target

Progress Towards Implementation

Remarks










Enhanced Operational Decisions through Integrated Meteorological Information (Planning and Near-term Service)




Target

Progress Towards Implementation

Remarks










Performance Improvement through the Application of SWIM




Target

Progress Towards Implementation

Remarks










Optimum Capacity and Flexible Flights

Increased Capacity and Efficiency through Interval Management




Target

Progress Towards Implementation

Remarks










Improved Operations through Optimized ATS Routing




Target

Progress Towards Implementation

Remarks










Enhanced Flow Performance through Network Operation Planning




Target

Progress Towards Implementation

Remarks










Ground-based Safety Nets on Approach




Target

Progress Towards Implementation

Remarks










Efficient Flight Path

Improved Flexibility and Efficiency in Descent Profiles (CDOs) using VNAV




Target

Progress Towards Implementation

Remarks










Initial Integration of Remotely Piloted Aircraft (RPA) into Non-integrated Airspace




Target

Progress Towards Implementation

Remarks










Improved Traffic Synchronization and Initial Trajectory-Based Operation




Target

Progress Towards Implementation

Remarks











(AS-2-1): Identify any limitation(s) in meeting ICAO ASBU 1 objectives

Insert Response Here:
(AS-2-2): Additional comments, as needed

Insert Response Here:
(AS-3): Indicate the status of the FIR’s compliance with ASBU Block 2 objectives. Insert your response using the following criteria:

FI – Fully Implemented

PI (%) – Partially Implemented, include approximate percentage of completion

NI – Not Implemented

NA – Not Applicable
Insert Response Here:

Table : AS-3, ASBU Block 2



Performance Improvement Area

Block 2 Module (2023)

Status

(FI, PI%, NI, NA)

Airport Operations

Advanced Wake Turbulence Separation (Time-based)




Target

Progress Towards Implementation

Remarks










Linked AMAN/DMAN




Target

Progress Towards Implementation

Remarks










Optimized Surface Routing and Safety Benefits (A-SMGCS Level 3-4 and SVS)




Target

Progress Towards Implementation

Remarks










Globally Interoperable Systems and Data

Improved Coordination through multicenter Ground-Ground Integration: (FFICE/1 and Flight Object, SWIM)




Target

Progress Towards Implementation

Remarks










Enabling Airborne Participation in collaborative ATM through SWIM




Target

Progress Towards Implementation

Remarks










Increased user involvement in the dynamic utilization of the network.




Target

Progress Towards Implementation

Remarks










Optimum Capacity and Flexible Flights

Airborne Separation (ASEP)




Target

Progress Towards Implementation

Remarks










New Collision Avoidance System




Target

Progress Towards Implementation

Remarks










Efficient Flight Path

Improved Flexibility and Efficiency in Descent Profiles (CDOs) using VNAV, required speed and time at arrival




Target

Progress Towards Implementation

Remarks










RPA Integration in Traffic




Target

Progress Towards Implementation

Remarks











(AS-3-1): Identify any limitation(s) in meeting ICAO ASBU 2 objectives

Insert Response Here:
(AS-3-2): Additional comments, as needed

Insert Response Here:

(AS-4): Indicate the status of the FIR’s compliance with ASBU Block 3 objectives. Insert your response using the following criteria:

FI – Fully Implemented

PI (%) – Partially Implemented, include approximate percentage of completion

NI – Not Implemented

NA – Not Applicable
Insert Response Here:

Table : AS-4, ASBU Block 3



Performance Improvement Area

Block 3 Module (2028)

Status

(FI, PI%, NI, NA)

Airport Operations

Integrated AMAN/DMAN/SMAN




Target

Progress Towards Implementation

Remarks










Globally Interoperable Systems and Data

Improved Operational Performance through the introduction of Full FF-ICE




Target

Progress Towards Implementation

Remarks










Enhanced Operational Decisions through Integrated Meteorological Information (Near-term and Immediate Service)




Target

Progress Towards Implementation

Remarks










Traffic Complexity Management




Target

Progress Towards Implementation

Remarks










Optimum Capacity and Flexible Flights

There are no Block 3 Modules to this Performance Improvement Area.

Efficient Flight Path

Full 4D Trajectory-based Operations




Target

Progress Towards Implementation

Remarks










RPA Transparent Management




Target

Progress Towards Implementation

Remarks











(AS-4-1): Identify any limitation(s) in meeting ICAO ASBU 3 objectives

Insert Response Here:
(AS-4-2): Additional comments, as needed

Insert Response Here


Download 2.67 Mb.

Share with your friends:
1   2   3   4   5   6   7   8   9   ...   26




The database is protected by copyright ©ininet.org 2024
send message

    Main page