Personnel Information
Current Designation : Civil Engineer Surveyor.
Current Location : Abudhabi-U.A.E
Total Experience : 12 years 06 months
Notice Period : Max. 30days
Current Salary :
Expected Salary : Negotiable.
Contact Number : 00971567333875/00919524612634.
Date of Birth : June 27, 1978.
Passport Number : J 3343391
Driving License : Valid UAE, Qatar & India driving license.
Education
-
Bachelor of Civil Engineering -Year of Passing : 2000, scored 70% (Attested & Degree Verified )
|
I have gained 12 years 06 months of working experience in various aspects of the Construction Industry with specialization in all kind of Civil Structures. The main duties have included but not limited to:
-
Executing the work as per drawings.
-
Know, understand, Apply and enforce all safety rules, regulations and precautions pertaining to work.
-
To conduct regular tool box meeting to all work crew to high light their responsibility and Job related hazards.
-
Ensure the proper usage of PPE at site.
-
Regular co-ordination with QC department for daily inspections.
-
Monthly work progress Inspection with management and client.
-
Maintain good housekeeping at site.
-
Attend daily Construction co-ordination and Safety meeting.
-
PTW co-ordination and Implementation at site for Construction, Pre-commissioning and commissioning work.
-
Regular co-ordination with safety department on day to day activity.
-
Coordinate with Client, Main Contractor and Sub contractors in all effective implementation of jobs.
-
Effective utilization of resources.
-
Site documentation works.
-
Set an example.
Work History
|
Year
|
Position
|
Employer
|
Client
|
Project
|
Location
|
Jan2012-Till now
|
Civil Engineer Surveyor
|
Moody International Limited
|
Abudhabi Oil Refining Company-Takreer
|
Takreer Group III Base Oil Production Facility Project-5574
|
Ruwais Refinery-Abudhabi
|
Mar2011-Dec2011
|
Third party Civil inspector
|
Moody International Limited
|
Abudhabi Oil Refining Company-Takreer
|
Isomerate Quality Improvement-5625
|
Ruwais Refinery-Abudhabi
|
Jun2009-Feb2011
|
Senior project Engineer
|
Indian Trading & Contracting W.L.L
|
Ministry of Interior-Engineering & Maintenance division
|
Old Al Rayyan Security Complex Project
|
Rayyan-Doha-Qatar
|
Jan2008-May2009
|
Project Engineer
|
ITC contracting LLC
|
Fujairah Refinery Company Limited
|
Fujairah Terminal Expansion Project
|
Fujairah-U.A.E
|
Dec2006- Dec2007
|
Site Engineer
|
Golden City Tech & Contracting Co. L.L.C(sister concern of ITC contracting LLC)
|
Sharjah Municipality
|
R-405 Diftah-Shis Road. Box Culverts and Tunnel Project
|
Diftah-Sharjah-U.A.E
|
Oct2003-Oct2006
|
Site Engineer
|
Nasser S.Al Hajri
|
SASOL & QATAR PETROLEUM JOINT VENTURE
|
ORYX GTL PROJECT
|
RLIC-Qatar
|
Jun2002-Aug2002
|
Drafting Engineer
|
Dar al kaleej Trading
|
Shade Structures Bin Dair
|
Khalifa park Shade structures
|
Abudhabi-U.A.E
|
May2000-Sept2003
|
Site Engineer
|
Rich Construction India.
|
-
|
Residential Buildings, Commercial Complexes, Telephone Exchange Building
|
India
|
Jan 2012 to Till date
Organization : Moody International Limited
Project : Takreer Group III Base oil production facilities
Client : Abudhabi Oil Refining Company(Takreer)
Position held : Civil Engineer Surveyor .(PMC)
Job Responsibility:
-
All Field Inspection and Co-ordination of inspection activities to ensure the quality requirements in the contract are met.
-
Review/approval of all inspection reports and the maintenance of the centralized filing of inspection reports.
-
Review/approval of all method statements (MS), inspection test plan (ITP) and material approvals (MAR).
-
Reviewing all the IFC drawings in conjunction with project specification.
-
Ensuring that the inspection and test procedures are adhered to Project specification and standards.
-
Coordinating inspections and test with field inspectors/Engineers and Subcontractors.
-
Co-ordinate the witness of inspections and test with the Consultant/Client.
-
Attended the auditing of quality systems & documentation in construction sites.
-
Submitting Handing over final Dozer to client for completion certification.
-
Inspections of material delivery as per approved quality plans and as per contract requirements.
SCOPE OF WORKS IN GROUP III BASE OIL PRODUCTION FACILITY PROJECT(LBO-5574 TAKREER) :
The main scope have included but not limited to:
-
TEMPORARY FACILITIES
-
Fixing Temporary fencing around the work area(around 4000LM)
-
Construction of Site office/dining/store/toilet facilities
-
Survey markings of all working boundary area
-
PIPE RACK FOUNDATIONS
-
Construction of foundations for Base oil unit Pipe rack
-
Construction of foundations for Interconnection Pipe rack
-
Construction of foundations for Equipment structure Pipe rack 1 & 2.
-
BUILDINGS
-
Construction of Substation buildings SS900, SS901, SS902 & SS903.
-
Construction of Workshop building WS001
-
Construction of Satellite instrument shelter SIS-19, 20&21.
-
TANKS
-
Construction of Concrete ring wall foundation.
-
Backfilling inside ring walls.
-
HDPE leak detection pipe1”, HDPE liner 2mm thick installation.
-
EQUIPMENT FOUNDATIONS
-
Construction of transformer rectifier foundation.
-
PIPE FOUNDATION
-
Construction of platform foundations, pipe supports and pipe sleeper foundations.
-
UNDER GROUND FOUNDATION
-
Construction of Electrical/Instrument duct banks, RC electrical/instrument cable trenches, RC box culverts, RC pipe trenches.
-
STORMWATER/BOX CULVERT FOUNDATION
-
Construction of storm water ditches, RC concrete pipes, RC storm catch basins, RC sand traps.
-
Construction of soak-away.
-
OILY SEWER/SANITARY SEWER FOUNDATION
-
Construction of OILY water storage pit, manhole and valve pits.
-
GRE PIPES & FITTINGS INSTALLATION
-
Construction of GRE pipes varies from Ф75mm to Ф400mm for oily water system.
-
Construction of GRE pipes varies from Ф50mm to Ф400mm for accidentally oily water system.
-
Spigot connection (adhesive bonded) and lamination connection of pipe and fittings.
-
BUND WALL
-
Construction of earthen bund wall
-
Construction of bund wall slope paving
-
STEEL STRUCTURE
-
Steel structure erection and alignment.
Reference : MR. Robert Spivey( QA/QC Manager) : Shaw Group : 00971504456984
Mar 2011 to Dec 2011
Organization : Moody International Limited
Project : Isomerate Quality Improvement project-5625
Client : Abudhabi Oil Refining Company(Takreer)
Position held : Third Party Inspector-Civil.(PMC)
Job Responsibility:
-
All Field Inspection and Co-ordination of inspection activities to ensure the quality requirements in the contract are met.
-
Review/approval of all inspection reports and the maintenance of the centralized filing of inspection reports.
-
Ensuring that the inspection and test procedures are adhered to Project specification and standards.
-
Coordinating inspections and test with field inspectors/Engineers and Subcontractors.
-
Co-ordinate the witness of inspections and test with the Consultant/Client.
-
Attended the auditing of quality systems & documentation in construction sites.
-
Submitting Handing over final Dozer to client for completion certification.
-
Inspections of material delivery as per approved quality plans and as per contract requirements.
SCOPE OF WORKS IN ISOMERATE QUALITY IMPROVEMENT PROJECT :
The main scope have included but not limited to:
-
Temporary facilities:
-
Fixing Temporary fencing around the work area(around 400LM)
-
Construction of Site office/dining/store/toilet facilities
-
Survey markings of all working boundary area
-
Construction of foundations for utility Pipe rack
-
Construction of foundations for cooler Pipe rack
-
Construction of equipment foundations like naphtha splitter, light naphtha storage drum, LP condensate drum, Backwash material collection drum, Closed blow Down drum,
-
Construction of pump foundations for feed and discharge
-
Hard landscaping(curbstone laying)-500LM
-
Construction of Electrical and instrumentation duct banks and cable trenches
-
Construction of concrete paving.
-
Construction of concrete ditches with sand trap.
-
Installation of GRE pipes varies from Ф75mm to Ф400mm for oily water system.
-
Installation of GRE pipes varies from Ф50mm to Ф400mm for accidentally oily water system.
-
Spigot connection (adhesive bonded) and lamination connection of GRE pipe and fittings.
-
Construction of Asphalt road with 150mm thick sub base, 70mm thick wearing course and 30mm thick wearing course with tack coat and seal coat-250LM (road width-8.0m).
-
Steel structure erection and alignment.
Reference : Mr.Ravanan(construction Superindent) : Tehnicas Reunidas(TRE) : 0097501336956
Mr.Banerjee(Senior Structural Engineer) : Tehnicas Reunidas (TRE) : 0097507219175
June 2009 to Feb 2011
Organization : Indian Trading and contracting W.L.L
Project : Al Ray an Security Complex Project
Owner : Ministry of Interior(Qatar)
Consultant : Sketch Engineering
Main Contractor : Arab united construction
Position held : Senior Project Engineer.
Job Responsibility:
-
Responsible for 05 site Engineers, 12 supervisors and 456 workers
-
Quantity Surveying
-
QA/QC coordination
-
Planning and Schedule making.
-
Executing the work as per drawings.
-
Preparation of BOQ
-
Know, understand, Apply and enforce all safety rules, regulations and precautions pertaining to work.
-
To conduct regular tool box meeting to all work crew to high light their responsibility and Job related hazards.
-
Ensure the proper usage of PPE at site.
-
Regular co-ordination with QC department for daily inspections.
-
Monthly work progress Inspection with management and client.
-
Maintain good housekeeping at site.
-
Attend daily Construction co-ordination and Safety meeting.
-
PTW co-ordination and Implementation at site for Construction, Pre-commissioning and commissioning work.
-
Regular co-ordination with safety department on day to day activity.
-
Coordinate with Client and Sub contractors in all effective implementation of jobs.
-
Effective utilization of resources.
-
Site documentation works.
-
Set an example.
SCOPE OF WORKS IN AL RAYAN SECURITY COMPLEX PROJECT :
The main scope have included but not limited to:
-
temporary facilities:
• Fixing Temporary fencing around the work area(around 760LM)
• Construction of Site office/dining/store/toilet facilities
• Survey markings of all working boundary area
-
Construction of Boundary wall of height 2.75m from FFL with grooves and architectural features.
-
Hard landscaping(interlocks in the pathways)-6622Sq.M
-
Hard landscaping(curbstone laying)-3709LM
-
Construction of Asphalt road with 150mm thick subbase,70mm thick wearing course and 30mm thick wearing course with tack coat and seal coat-6911LM(road width-8.0m)
-
Construction of 09 buildings (1no.-basement+ground+first, 2no.s-ground+first, 06no.s-ground) of height varies from 4.40m to 12.95m.
Reference : Mr. Ricardo(Site Inspector ) : Sketch Engineering : 0097466548922
Mr. Khalid(Project Manager ) : Sketch Engineering : 0097455865785
Mr. Imzad : MOI(client) : 0097433802341
January 2008 to May 2009
Organization : ITC Contracting LLC-Dubai
Project : Fujairah Terminal Expansion Project(FTEP)
Owner : Fujairah Refinery Company Limited(FRCL)
Main Contractor : Audex PTE LTD-Singapore.
Position held : Project Engineer
Job Responsibility:
-
Responsible for 05 Supervisors and 195 workers.
-
Equipment mobilization
-
Quantity Surveying
-
QA/QC coordination
-
Planning and Schedule making.
-
Executing the work as per drawings.
-
Preparation of BOQ
-
Know, understand, Apply and enforce all safety rules, regulations and precautions pertaining to work.
-
To conduct regular tool box meeting to all work crew to high light their responsibility and Job related hazards.
-
Ensure the proper usage of PPE at site.
-
Regular co-ordination with QC department for daily inspections.
-
Monthly work progress Inspection with management and client.
-
Maintain good housekeeping at site.
-
Attend daily Construction co-ordination and Safety meeting.
-
PTW co-ordination and Implementation at site for Construction, Pre-commissioning and commissioning work.
-
Regular co-ordination with safety department on day to day activity.
-
Coordinate with Client and Sub contractors in all effective implementation of jobs.
-
Effective utilization of resources.
-
Site documentation works.
-
Set an example.
SCOPE OF WORKS IN FTEP :
-
AREA PREPERATION:
• Removal of Plants ,small trees and shrubs with topsoil of thickness 100mm to 150mm
• Backfilling the topsoil removed area by layer by layer after doing initial compaction (120,000Sq.M Area )
• Survey markings of all working boundary area
-
Construction of Tank foundation Pad(earth filling by layer by layer up to a height of 1.80m with installation of HDPE leak detection pipe, HDPE liner installation, Oil sand filling dia of tank pad varies from 26.0m to 57.00m).
-
Construction of Bund wall of Height 1.8,1.4,1.20m from FGL
-
Construction of Valve manifolds and pump stations
-
Construction of Fire fighting shed
-
Pipe sleepers and pipe support foundations, platform foundations
-
Construction of Valve manifold foundation and Pump station foundation
-
Construction of Generator room and Substation building
-
Construction of Concrete pipe rack and Pipe bridge foundations around 425m long
-
Construction of Storm water drain, road crossing, Cable trenches.
Reference : Mr. Bernard(Construction Manager ) : Audex pvt ltd(Singapore) : 050 8237660
Mr. Thanwin ( Project Engineer) : Audex pvt ltd(Singapore) : 050 3915290
Mr. Milind powar ( Project Engineer) : FRCL : 050 9393768
December 2006 to December 2007
Organization : Golden City Tech & Contracting Co. L.L.C(sister concern of ITC contracting LLC)
Project : R-405 Diftah-Shis Road. Box Culverts and Tunnel Project
Owner : Sharjah Municipality
Main Contractor : Hal crow International Partnership, Sharjah.
Position held : Civil Site Engineer
Job Responsibility:
-
Responsible for 02 Supervisors and 78 workers.
-
Quantity Surveying
-
Planning and Schedule making.
-
QC documents preparation and coordination with consultant
-
Executing the work as per drawings.
-
Preparation of BOQ
-
Know, understand, Apply and enforce all safety rules, regulations and precautions pertaining to work.
-
To conduct regular tool box meeting to all work crew to high light their responsibility and Job related hazards.
-
Ensure the proper usage of PPE at site.
-
Regular co-ordination with QC department for daily inspections.
-
Monthly work progress Inspection with management and client.
-
Maintain good housekeeping at site.
-
Attend daily Construction co-ordination and Safety meeting.
-
PTW co-ordination and Implementation at site for Construction, Pre-commissioning and commissioning work.
-
Regular co-ordination with safety department on day to day activity.
-
Coordinate with Client and Sub contractors in all effective implementation of jobs.
-
Effective utilization of resources.
-
Site documentation works.
-
Set an example.
SCOPE OF WORKS IN R-405 DAFTAH SHIS ROAD AND TUNNEL PROJECT:
-
RCC CULVERTS :
• Execution of one big culvert with a size of two shells opening 3.5x3.5x170m. Base Slab 10x23x2.5 M, Roof Slab 10x23x2.0m
• Execution of one culvert with a size of two shells opening 3.5x3.5x163m. Base Slab 8.2x13.75x0.6, Roof Slab 8.2x13.5x0.5M
• Water stopper installation
• Movement joint Cellular polyethylene sheet fixing
• Wall waterproofing ( polyp rime painting, Bitustick fixing and Bitu board fixing )
• Execution of Wing walls with various sizes
Reference : Mr. Thomas Kurian(Site Engineer ) : Hal crow : 050 5305749
Mr. Husain ( Survey Inspector) : Hal crow : 050 3904416
Mr. Mohan ( Material Inspector) : Hal crow : 050 7920159
October 2003 to October 2006
Organization : Nasser S. Al-Hajri Co.Ltd, GTL Project
Project : ORYX GTL – Gas to liquid project, Raslafan Industrial city- State of Qatar
Owner : SASOL & QATAR PETROLEUM JOINT VENTURE
Main Contractor : TECHNIP-ITALY
Position held : Civil Site Engineer
Job Responsibility:
-
Responsible for 06 Leadsman and 166 workers
-
Executing the work as per drawings.
-
Know, understand, Apply and enforce all safety rules, regulations and precautions pertaining to work.
-
To conduct regular tool box meeting to all work crew to high light their responsibility and Job related hazards.
-
Ensure the proper usage of PPE at site.
-
Regular co-ordination with QC department for daily inspections.
-
Monthly work progress Inspection with management and client.
-
Maintain good housekeeping at site.
-
Attend daily Construction co-ordination and Safety meeting.
-
PTW co-ordination and Implementation at site for Construction, Pre-commissioning and commissioning work.
-
Regular co-ordination with safety department on day to day activity.
-
Coordinate with Client and Sub contractors in all effective implementation of jobs.
-
Effective utilization of resources.
-
Site documentation works.
-
Set an example.
SCOPE OF WORKS IN ORYX GTL PROJECT:
1.CONCRETE STRUCTURES:
• Execution of two big concrete structures with a height of 18.0metre from
Finished ground level (F.G.L).
Each structure has 99 beams (of span 8.0metre,6.0metre),23 columns and 2
Slabs .Each structure has 224 anchor bolts and 262 insert plates.
• Execution of 10 small structures at a height of 8.0m from F.G.L.
• Execution of another 2 structures with 12 columns of 18.0m (without beams).
2.HEATER FOUNDATIONS
• Execution of 3 heater foundations in which one was the biggest heater
foundation in ASIA (Productive of 863 Cu.M/Hr) having 63 columns at a height
of 6.20m from F.G.L It had 372 bucket type anchor bolts
• Rest two heaters consists of 28 columns with a height of 4.10m.It had 140
3.EQUIPMENT FOUNDATIONS
• Execution of around 40 equipment foundations for reactor with anchor bolts
4.ANCHOR BOLTS INSTALLATION
• Installation of anchor bolts and cross checking around 3000 anchor bolts
5.ROAD WORKS
• Construction of Box culverts , Road crossing drains and ditches, Gravel road, Concrete road, Asphalt road, Vehicular guard rail system.
REFERENCE
Mr.V.G.Nair (Construction Manager) N.S.H Co. Ltd. Phone : 009745860843
Mr. John (Civil Inspector) Technip-Italy Phone : 009745471101
Mr.Sancho (Civil Inspector) Technip-Italy Phone : 009745369706
May 2000 to October 2003
Organization : Rich Construction , India
Position held: Civil Engineer.
Projects: Residential Buildings, Commercial Complexes, Telephone Exchange Building.
Job Responsibility :
-
Planning and Execution of all kinds of Works
-
Estimation
-
Drafting
-
Coordination with the consultancy
-
Cost control
|