Engineering Design and Development



Download 4.32 Mb.
Page14/19
Date28.05.2018
Size4.32 Mb.
#50606
1   ...   11   12   13   14   15   16   17   18   19


The Trojan Center East CEA

Margaret Wrzos, Mat Vallone, Chris Glaub and Ryan Cumbo


In this project, our team will develop an addition to the West Seneca East Senior High building, in the area adjacent to the north end of the front parking lot, next to the building. The extension will be connected to the existing building through an arched pathway that will connect the first floor of each building. The project will consist of a three-story extension that will serve for educational and senior leisure purposes. The first floor of the extension will consist of a mini-golf area, a stage for musical purposes, ping-pong tables, and a chill area, which will contain couches, TVs, and food stands. The second floor of the building will be a movie theatre, which will contain a popcorn machine. The top floor will serve as an observatory, which will be available for students in science classes or students interested in astronomy.

Directory: site -> handlers

Download 4.32 Mb.

Share with your friends:
1   ...   11   12   13   14   15   16   17   18   19




The database is protected by copyright ©ininet.org 2024
send message

    Main page