Oil Tanker Construction


Ventilation and gas-freeing



Download 1.08 Mb.
Page34/60
Date16.12.2020
Size1.08 Mb.
#54495
1   ...   30   31   32   33   34   35   36   37   ...   60
155646687-Oil-Tanker-Construction-Rules

Ventilation and gas-freeing

  • Cargo tanks are to be provided with a high level alarm independent of the gauging device or with equivalent means to guard against liquid rising in the venting system to a height exceeding the design head of the cargo tanks.
  • Pressure and vacuum valves may be set higher during voyage for the prevention of cargo losses than for controlled venting during loading.
  • Pressure/vacuum valves which are located in masthead risers may be fitted with a by-pass arrangement which can be opened during cargo operations.
  • Indicators shall clearly show whether the by-pass valve is in the open or closed position.

Download 1.08 Mb.

Share with your friends:
1   ...   30   31   32   33   34   35   36   37   ...   60




The database is protected by copyright ©ininet.org 2024
send message

    Main page