Part 1 Infrastructure Development Plan of Cocc 1 Chapter 2Introduction 1 Chapter 3Present Condition of Cocc 4



Download 2.33 Mb.
Page1/20
Date02.06.2018
Size2.33 Mb.
#53213
  1   2   3   4   5   6   7   8   9   ...   20

Local Government Engineering Department

People’s Republic of Bangladesh

The Project for Developing
Inclusive City Governance
for City Corporation

Final Report


Volume 3
CoCC Edition

March 2014


JAPAN INTERNATIONAL COOPERATION AGENCY

PADECO Co., Ltd.




Contents


The Project for Developing Inclusive City Governance for City Corporation 1

Final Report 1

Volume 3 1

CoCC Edition 1

PADECO Co., Ltd. 2

Contents 1

Annexes 1

Figures 3

Tables 3

List of Abbreviations 5

Working Group 6

PART 1 Infrastructure Development Plan of CoCC 1

Chapter 2Introduction 1

Chapter 3Present Condition of CoCC 4

Source: CoCC 2012 Preparation of Updated Land Use Plan CoCC, March 2012 14

Chapter 4Vision and Goal Setting 17

Chapter 5Preparation of Inclusive Subproject List 22

Chapter 6Planning, Implementation, Evaluation and O&M Arrangement 29

Chapter 7Financial Planning of CoCC 33

Chapter 8Amendment of Rolling Plan 36

PART 2 Governance and Financial Reform Program 40

Chapter 9Governance and Financial Reform Program 35

PART 3 JICA Loan Projects 39

Chapter 10JICA Loan Projects 47

Consolidation of Subproject No. 7 and part of Subproject No. 11 48

Consolidation of Subproject No. 8 and part of Subproject No. 11 48

Consolidation of Subproject No. 9 and part of Subproject No. 11 48

Sector-Level Priority 48

Area-Level Priority 49

Subproject No. 26: Solar-Powered LED Street Lighting at Comilla City Corporation 55

Subproject No. 22: Production Tube Well with Pump House and Related E/M Works 56

Subproject No. 24: Surface Water Treatment 56

Subproject No. 1: Improvement of Urban Transport (Road + Drain, Ward 1–3) 56

Subproject No. 2: Improvement of Urban Transport (Road + Drain, Ward 1–6) 56

Subproject No. 3: Improvement of Urban Transport (Road + Drain, Ward 7–9) 56

Subproject No. 4: Improvement of Urban Transport (Road + Drain, Ward 10–12) 56

Subproject No. 5: Improvement of Urban Transport (Road + Drain, Ward 13–15) 56

Subproject No. 6: Improvement of Urban Transport (Road + Drain, Ward 16–18) 57

Subproject No. 8: Improvement of Urban Transport (Road + Drain + Bridge, Ward 22–24) 57

Subproject No. 12: Development or Improvement of Five Khals/Canals 57

Subproject No. 27: Street Lighting on PDB Poles with Cable Extension at Comilla City Corporation 57

Subproject No. 10: Reconstruction of a 20 m Span RCC Bridge 57

Subproject No. 28: Street Lighting on PDB Pole with Cable Extension at Comilla City Corporation 57

Chapter 11Baseline Survey and Economic Analysis 62

Annexes

Annex D-1 Inclusive List of Infrastructure Development D-1

Annex H-1 Administrative Reform Plan of CoCC H-1

Annex H-2 Function Performance Analysis and 5 Year Action Plan H-22

Figures


Figure 1‑1: Institutional Structure for IDPCC Management 2

Figure 2‑2: Average Minimum and Maximum Temperate in CoCC 4

Figure 2‑3: Average Rainfall in CoCC 4

Figure 2‑4: Location of Major Bodies of Water in CoCC 5

Figure 2‑5: Topographic Conditions in CoCC 6

Figure 2‑6: Existing Land Use of CoCC 12

Figure 7‑7: Subproject Ideas and Funding 36

Figure 7‑8: Replacement of Subprojects in Inclusive List 37

Figure 9‑9: Location of Shortlisted Subprojects 61


Tables




Table 1‑1: Components of the Institutional Structure 2

Table 2‑2: Population of CoCC (2011) 7

Table 2‑3: School Attendance by Age Group 7

Table 2‑4: General Education Level of CoCC by Literacy Rate 7

Table 2‑5: Major Facilities in CoCC 9

Table 2‑6: Comilla District Industrial Gross Value Added (2005–06, in thousand BDT) 10

Table 2‑7: Types of Holdings 11

Table 2‑8: Distribution of Land Use in CoCC 11

Table 3‑9: Population Projection in CoCC 17

Table 3‑10: Resources Available in CoCC 18

Table 3‑11: Industrial Projection of CoCC 18

Table 3‑12: Vision of CoCC 19

Table 3‑13: Development Objectives for CoCC Infrastructure Development 19

Table 3‑14: Infrastructure Sub-Sector Priorities and Issues 19

Table 3‑15: Five-Year CoCC Infrastructure Development Goal 21

Table 4‑16: Analysis of Existing Infrastructure 22

Table 4‑17: Summary of Existing and Proposed Infrastructure (Transport) 24

Table 4‑18: Summary of Existing and Proposed Infrastructure (Drainage) 24

Table 4‑19: Summary of Existing and Proposed Infrastructure (SWM) 25

Table 4‑20: Summary of Existing and Proposed Infrastructure (WSS) 25

Table 4‑21: Summary of Existing and Proposed Infrastructure (Sanitation) 26

Table 4‑22: Summary of Existing and Proposed Infrastructure (Municipal Facilities) 26

Table 4‑23: Summary of Inclusive Infrastructure Development List of CoCC 27

Table 5‑24: Suggested Indicators for Subproject Evaluation 31

Table 6‑25: CoCC Revenue and Expenditure over the Past Three Years 34

Table 6‑26: Examples of External Funding Sources for Infrastructure Projects 34

Table 8‑27: Prioritized Infrastructure Topics and Strategy 35

Table 8‑28: CoCC Revenues and Expenditures for the Past Three Years 38

Table 8‑29: CoCC Holding Tax Rate 39

Table 8‑30: Number of Holdings in CoCC 39

Table 8‑31: CoCC Tax Collection Efficiency 40

Table 8‑32: CoCC Tax Revenues for 2012–13 41

Table 8‑33: Water Tariff in CoCC 42

Table 8‑34: CoCC Water Supply Revenue and Expenditure 42

Table 8‑35: CoCC Waste Management Revenues and Expenditures 43

Table 8‑36: CoCC Fee Revenues over the Past Three Years 44

Table 9‑37: JICA Project List by CoCC 47

Table 9‑38: Reorganized Subproject Number and Cost 48

Table 9‑39: Priority Evaluation Results 50

Table 9‑40: Preliminary Review on Environmental and Social Consideration 52

Table 9‑41: Priority and Cumulative Cost for Select Subprojects in Stage 2 55

Table 9‑42: Readiness Assessment Results 58

Table 9‑43: Selected Subprojects in Stage 3 59

Table 9‑44: Selected Subprojects after Estimation 60

Table 9‑45: Sector-wise Summary of Selected Subprojects 60

Table 10‑46: Selected CoCC Road/Bridge Subprojects 62

Table 10‑47: Traffic Count Survey Results (City Road) 63

Table 10‑48: Traffic County Survey Results (Connector Road) 63

Table 10‑49: Traffic Count Survey Results (Local Road) 64

Table 10‑50: Selected CoCC Drainage Subprojects 65

Table 10‑51: Current Drainage System in CoCC 65

Table 10‑52: Selected GCC Street Lighting Subprojects 67

Table 10‑53: Nighttime Traffic Count Survey Results 68

Table 10‑54: Selected GCC Water Supply Subprojects 69



List of Abbreviations


ADB

Asian Development Bank

ADP

Annual Development Program

BBS

Bangladesh Bureau of Statistics

BDT

Bangladesh Taka

BTTB

Bangladesh Telegraph and Telephone Board

C/P

Counterpart

CBO

Community Based Organization

CC

City Corporation

CD

Capacity Development

CoCC

Comilla City Corporation

CPU

Comprehensive Planning Unit

CSCC

Civil Society Coordination Committee

DAP

Detailed Area Plan

DG

Director General

DMDP

Dhaka Metropolitan Development Plan

DOE

Department of Environment

DPHE

Department of Public Health and Engineering

ECA

Environment Conservation Act

ECC

Environmental Clearance Certificate

ECR

Environmental Conservation Rules

ED

Engineering Department (of CC)

EIA

Environmental Impact Assessment

EMP

Environmental Management Plan

GOB

Government of Bangladesh

GOJ

Government of Japan

HD

Health Department

ICGP (Loan)

Inclusive City Governance Project (JICA Loan Project)

ICGP (Prep)

The Technical Corporation Project for Development Planning for Inclusive City Governance (Preparatory project of the above mentioned ICGP(Loan))

ICT

Information Communication Technology

IDPCC

Infrastructure Development Plan of City Corporation

IEE

Initial Environmental Examination

JICA

Japan International Cooperation Agency

LGD

Local Government Division

LGED

Local Government Engineering Department

M/M

Minutes of Meeting

MOEF

Ministry of Environment and Forestry

MoLGRD&C

Ministry of Local Government Rural Development & Cooperatives

NGO

Non-government organization

NOC

No objection Certificate

PAP

Project Affected Person

PD

Project Director

PIUCC

Project Implementation Unit at City Corporation

PS

Pourashava (a type of municipality in Bangladesh)

RAJUK

Rajdhani Unnayan Kartripakkha
(Capital Development Authority of the Government of Bangladesh)

R/D

Record of Discussion

RHD

Road and Highway Department

SC

Steering Committee

SCM

Stakeholder Committee Meeting (name was changed from Stakeholder Meeting (SM))

SWM

Solid Waste Management

TLCC

Town Level Coordination Committee

TOR

Terms of Reference

UGIAP

Urban Governance Improvement Action Program

UGIIP

Urban Governance and Infrastructure Improvement (Sector) Project

UPPR

Urban Poor Promotion Project

WASA

Water Supply & Sewerage Authority

WB

World Bank

WG

Working Group

WLCC

Ward Level Coordination Committee

WSS

Water Supply System





PART 1



Infrastructure Development Plan of CoCC





  1. Download 2.33 Mb.

    Share with your friends:
  1   2   3   4   5   6   7   8   9   ...   20




The database is protected by copyright ©ininet.org 2024
send message

    Main page