Petroleum Development Oman LLC Version: 2.0 Effective Oct. 2017 Page
17 Specification for Construction Activities on Oil, Gas and Utility Facilities Projects Version: 2.0 Effective Oct. The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED. d) Roles and responsibilities of Key Personnel and other essential Contractor Personnel e) Performance management procedures f) Change control g) Procurement management and procedures h) Procurement control (inspection, expediting and logistics i) Construction
management structure, procedures and organization j) Testing and pre-commissioning procedures and organization k) Commissioning assistance l) Schedule and cost planning, monitoring and reporting m) Plan for audits and reviews n) Quality Assurance and Quality Control o)
Contract Health, Safety and Environment (HSE) plan p) Logistics including transport management and supervision q) Omanisation and Local Community Contractor (LCC) management
3.8 Maintenance of As-Built Drawings The Contractor shall maintain the AFC drawings. The maintenance shall be in accordance with PR – Engineering and Operations Document Drawing and Data Management Procedure and SP – Plant Lifecycle Information Plan. Approval of the changes shall be recorded by signature of PDO Project Manager / Site Representative on the marked-up prints.
Share with your friends: