PTW Assessment Preparation
170- How can increase the number of workers more than 20?
-By risk assessment Another permit Another permit holder
171- What is mean by HSE?
-Health Safety Environment
172- Who is isolation subversive
Area authority
173- How can know the isolations’ location
Beefs (drawings)
174- In cold cutting, how do you do the flashing
One hose from the oil pipe to the Container and then, from the Container to the vacuum tanker
175- In cold cutting, why the LEL should be less than 4 not zero
Because in cold cutting there is no machine produce spark, that way no problem if we go to 4%
176- What is SIMPOS?
It is simultaneous operation, if two activity conflicting with each other in same time and same location
177- What is buddy system
This system is used to work in confined space one person outside the confined space is provided all the time, that person communicates continuously with person who is working inside. These people will work turn by turn after 30 minutes.


26

178- Who is AGT?
l. A persons have a valid Gas testing card and permit to work licensed. II. An "Authorized Gas Tester" is person who has passed the gas testing course and hold a valid gas tester card and has also passed permit holder or permit applicant course.
179- What is MOPO?
It is a matrix of Permitted operations -it has empowerment to stop any activity that feels unsafe- it is available with AA


27

180- What is NORM
Naturally Occurring Radioactive Materials. NORM are materials deposited in the form of uranium (238), Thorium (232). It's found in safety valves, wellheads, Manifold, Separators, Oil cooler, Pig wax and storage cells.
181- What is requirement for NORM
1) Disposable coverall
2) Rubber Gloves
3) Don’t have food and water at site
4) Don’t take any materials to camp and room
5) Dispose the NORM contaminated materials as per procedure