Flood and Erosion Projects
|
|
|
|
|
Project FLD 1. Structure Elevation and/or Relocation
|
City
DCRA, DHS&EM
FEMA
|
To be Determined
|
PDMG**
HMGP***
FMA****
|
Medium
|
Project FLD 2. Update Bethel FIRM Maps
|
FEMA
USCOE
|
>$10,000
|
PDMG**
HMGP***
FMA****
|
High
|
Project FLD 3. Public Education
|
City
DCRA
|
Staff Time
|
DCRA
|
Medium
|
Project FLD 4. Install upgraded streamflow and rainfall measuring gauges
|
City
DHS&EM
|
$10,000
|
PDMG
HMGP
|
Medium
|
Project FLD 5. Apply for grants/funds to implement riverbank protection methods.
|
City
|
Staff Time
|
PDMG
HMGP
|
Medium
|
Project FLD 6. Pursue obtaining a CRS ranking to lower flood insurance rates.
|
City
DCRA
|
Staff Time
|
City
|
High
|
Project FLD 7. Obtain flood insurance for all City structures, and continue compliance with NFIP.
|
City
|
$1,500
|
City
|
High
|
Project FLD 8. Bethel Cargo Dock/Replacement Seawall
|
USCOE
FEMA
City, DHS&EM
|
$8.5 million
|
PDMG
USC0E
|
High
|
Project FLD 9. Repair and Expand Harbor
|
USCOE
FEMA
City, DHS&EM
|
$10 million
|
PDMG
USC0E
|
High
|
Mitigation Projects
|
Responsible
Agency
|
Cost
|
Funding Sources
Possible
|
Priority*
|
Project FLD 10. Continued Repair of Existing Seawall
|
USCOE
FEMA
City/DHS&EM
|
>$70,000
|
PDMG
HMGP
|
High
|
Project FLD-11. Tie-back Replacement and Armor Rock Replacement
|
USCOE
FEMA
City/DHS&EM
|
To be determined
|
USCOE
PDMG
|
Medium
|
Severe Weather Projects
|
|
|
|
|
Project SW 1: Research and consider instituting the National Weather Service program of “Storm Ready”.
|
City
|
Staff Time
|
DCRA
|
High
|
Project SW 2: Conduct special awareness activities, such as Winter Weather Awareness Week, Flood Awareness Week, etc.
|
City
DCRA
DHS&EM
|
Staff Time
|
DCRA
DHS&EM
FEMA
|
High
|
Project SW 3: Expand public awareness about NOAA Weather Radio for continuous weather broadcasts and warning tone alert capability.
|
City
|
Staff Time
|
NOAA
|
High
|
Project SW 4: Encourage weather resistant building construction materials and practices.
|
City
|
Staff Time
|
City
|
Medium
|
Project SW 5: Install a siren to warn people of a severe weather or disaster event.
|
City
DCRA
DHS&EM
|
>$5,000
|
DCRA
DHS&EM
FEMA
|
High
|
Project SW 6: Installation of automated weather sensors. Automated weather sensors are the chief method by which the National Weather Service detects the occurrence of incoming severe weather.
|
DHS&EM
|
>$20,000
|
PDMG
|
Medium
|
Tundra/Wildland Fire Projects
|
|
|
|
|
Project FIRE 1. Acquire additional firefighting equipment and training for personnel.
|
City
DHS&EM
|
>$20,000
|
State Grant
|
High
|
Mitigation Projects
|
Responsible
Agency
|
Cost
|
Funding Sources
Possible
|
Priority*
|
Project FIRE 2. Promote Fire Wise building design, siting, and materials for construction.
|
State Div of Forestry
|
NA
|
State Grants
|
High
|
Project FIRE 3. Establish additional fire regulation and requirements.
|
City
|
Staff Time
|
State Grants
|
High
|
Project FIRE 4. Purchase additional fire fighting equipment and vehicles, such as a Fire Truck and fire extinguishers.
|
City
State Div of Forestry
|
>$150,000
|
State Grants
|
High
|
Earthquake Hazard Projects
|
|
|
|
|
Project EQ 1: Encourage development of earthquake resistance building codes and requirements.
|
City
|
Staff Time
|
State Grants
|
High
|
Project EQ 2: Enhance public awareness of potential risk to life and personal property from earthquakes. Encourage mitigation measures in the immediate vicinity of their property.
|
City
DHS&EM
DCRA
|
Staff Time
|
State Grants
|
High
|
Project EQ 3: If funding is available, perform an engineering assessment of the earthquake vulnerability of each identified critical infrastructure owned by the City of Bethel.
|
City
DHS&EM
|
Staff Time
|
PDMG
|
Medium
|
Project EQ 4: Identify buildings and facilities that must be able to remain operable during and following an earthquake event.
|
City
DHS&EM
|
Combine with Project EQ-3
|
PDMG
|
Medium
|
Project EQ 5: Contract a structural engineering firm to assess the identified buildings and facilities to determine their structural integrity and strategy to improve their earthquake resistance.
|
City
DHS&EM
|
Combine with Project EQ-3
|
PDMG
|
Medium
|