Casino reinvestment development authority bid for general construction


DIVISION 1 - GENERAL REQUIREMENTS



Download 0.6 Mb.
Page9/14
Date27.02.2018
Size0.6 Mb.
#41582
1   ...   6   7   8   9   10   11   12   13   14

DIVISION 1 - GENERAL REQUIREMENTS

01100 Summary




01110 Summary of Work


The Project consists of the general construction for façade renovations on the south side of the 1600 block of Atlantic Avenue in Atlantic City, NJ. It shall include all work shown on the drawings and called for in the specifications, or reasonably implied by the plans and specifications.




01140 Work Restrictions


01140.1 PROPERTY OWNER OCCUPANCY

      1. The Property Owner(s) intend to occupy the Project during the construction period for the conduct of normal operations.

      2. Cooperate with Property Owner to minimize conflict, and to facilitate Property Owner's operations.

      3. Provide continuous utility service and fully functional life safety systems throughout the construction period to Boardwalk Hall. Protect the building and patrons of the establishment involved/affected by the construction operations from injury resulting from all construction operations, equipment, installations or demolition.

      4. Schedule the Work to accommodate building occupancy and operation.




    1. RESERVED


01140.3 Work Time.

The Contractor is limited to working the Standard Working Hours. However, if the Contractor so requests, the Owner may consider seeking approval for the Contractor to work outside of the Standard Working Hours. No work is to be progressed outside of Standard Working Hours unless approved in writing by the Owner.


01140.4 Consideration and Safety of, and Coordination with merchant’s Operation.
The Contractor is aware that the Project Area is a major pedestrian and shopping area which may result in the public being attracted to the construction activity. As such, the Contactor shall take care and be cognizant at all times of pedestrians within right-of-ways and persons that may be attracted to the Work activities. At all times, the Contractor must take all necessary and desirable measures to protect equipment and materials used in performance of the Work from accessibility by third parties. The Contractor shall not be entitled to additional compensation or an extension of time in the Contract due to such pedestrian traffic conditions.
If in the opinion of the Owner, in consultation with the Architect, the Contractor is not abiding by applicable public safety laws and regulations, or determines that the Project Area has not been secured after work hours to prevent the injury to third parties, the Owner will instruct the Architect to halt the Project in accordance with Subsection 01310.14 (Temporary Suspension of Work) and contract with the local authorities or take whatever measures necessary and desirable to protect public safety. The Owner will be entitled to reimbursement of all reasonable costs and expenses from the Contractor associated with such determination, in accordance with Subsection 01360.14 (Recovery of Monies by the Owner).

01140.5 Damage to Property.

The Contractor shall protect all local roadways, and private property from damage. Any damage caused by the Contractor shall be considered part of the Contractor’s risk and included as part of the Contractor’s costs for the Project. The Contractor’s obligation in this Subsection is in addition to other similar obligations of the Contract, including those set forth in Sections and Subsections 00630.5 (Examination of Contract Documents and Site of Project), 11020 (Site Restoration and Final Cleanup), 01450.16 (Load Restrictions), 01450.17 (Maintenance During Construction), 01450.18 (Failure to Maintain Project Area, Surroundings and Roadway). A failure by the Contractor to repair any of the above mentioned items in a prompt and timely manner, as determined by the Owner, in its sole discretion, shall be cause for the Owner to contract with a separate contractor to repair the damage and be reimbursed by the Contractor in accordance with Subsection 01360.14 (Recovery of Monies by the Owner). An exception to requiring immediate repair may be approved by the Owner, if the damage is expected to be repetitive due to the nature of the vehicle traffic, is not a danger to the public, and not required by the owner of the right-of-way or other public property, or the private landowner impacted. However, all such approvals must be issued in writing by the Owner and the City. The Contractor shall also be responsible for repairing the damage allowed to remain until Substantial Completion at the Contractor’s cost or reimburse the Owner in accordance with Subsection 01360.14 (Recovery of Monies by the Owner).


01140.6 Use of Site.

The use of the Project Area is limited to the construction needed for the completion of the Project. The Project Area shall not be used to store equipment or materials other than that to perform the Work called for under the Contract. In addition, at the end of the work day, unless in a location that would prove difficult logistically to move equipment, all machinery and purchased materials shall be stored outside of the Project Area.



01200 Price and Payment Procedures



01210 Allowances
Allowance shall include cost to Contractor of specific products and materials ordered by Owner under allowance and shall include taxes, freight, and delivery to Project site.
Contractor’s costs for receiving and handling at Project site, labor, installation, overhead and profit, and similar costs related to products and materials ordered by Owner under allowance shall be included as part of the Contract Sum and not part of the allowance. All other costs will be reimbursed at actual with supporting documentation.

01270 Measurement of Quantities


Measurements will be made according to the United States customary English units.

The method of measurement and computations to be used in determination of quantities of Work performed under the Contract are those methods generally recognized as conforming to good architectural practice. The method of measurement chosen must be consistent and unchanging through the life of the Project.

The term “lump sum” when used as a basis of payment means complete payment for the Work of that item, and that item will not be measured.

When the unit price Pay Items set forth in Exhibit “H” and subsequent owner approved schedule of values are specified to be the pay quantity, either the Architect or the Contractor may request that the quantity be measured. If the Contractor makes such a request, it shall be accompanied by drawings, calculations, or other information indicating that the quantity in Exhibit “H” and subsequent owner approved schedule of values is not correct.



01280 Alternates
01280.1 Alternates are amounts, as stated by the Bidder in the Bid Form to be added to or deducted from the Base Bid in the event the Owner accepts the Alternate Proposal. Each Alternate shall be a net amount and shall include all variations in profit, overhead, bonds, insurance, taxes, and similar items as well as the costs for labor, materials, equipment, transportation, etc. Alternates shall conform to Drawings and Specifications.
01280.2 Alternates quoted on Bid Forms will be reviewed and accepted or rejected at the Owner's option.

Coordinate related Work and modify surrounding Work as required.


01280.3 Schedule of Alternates:



Download 0.6 Mb.

Share with your friends:
1   ...   6   7   8   9   10   11   12   13   14




The database is protected by copyright ©ininet.org 2024
send message

    Main page