This contract does not include the following:

1.21 Landscaping


1.22 Purchase of appliances and installation (air-con units, freezer, refrigerators, range hood and cooking range) and house furniture.
1.23 Payment of fees arising from application of membership of the Owner to local utility and cable companies or equivalent.
1.24 Purchase and installation of mirrors, automatic door closer, curtain hangers and rods and other interior accessories.
1.25 Drilling and installation of water wells. (please delete; not allowed at
Ayala)
1.26 The filling materials indicated in the plans and specifications is only within the premises of the building line. Filling of areas outside the building lines is not included in this contract.
1.27 The purchase and installation of photovoltaic (PV) panels at the south side of the roof for which the Owner will engage a separate contractor.

1.28 The purchase of tiles, water heaters, water closets, bathroom fixtures, doors, etc. will be done following consultation with the Owner.




ARTICLE 2. TIME OF COMPLETION

2.1 The work stipulated in this contract shall be completed “broom clean”, fully operational and ready for use not later than Nine (9) months after the commencement of the work unless delay is caused by the owner herself or by reason of her non-payment of her financial obligation to the Engineer or force majeure. Construction is scheduled to begin by February 2019. A detailed construction schedule is in Appendix --.


2.2 The counting construction period stipulated herein commences upon the start of the actual construction of the project and does not include Sundays and holidays.
2.3 Extra works agreed upon by both parties shall be subject to extension of the contract time.

ARTICLE 3. THE CONTRACT AMOUNT

That, for and in consideration of the faithful performance by the Engineer of this Contract, the Owner agrees to pay the amount of TEN MILLION NINETY THOUSAND SEVEN HUNDRED SIXTY-SEVEN PESOS (₱10,090,767.00), in manner provided hereinafter:


3.1 It is expressly agreed by both parties that no change shall be made in the above-mentioned contract amount as a result of any fluctuation in the cost of materials and/or labor.


3.2 Should the Owner require the Engineer to perform work over and above the mentioned by this Agreement, the additional cost shall be added to the Contract Amount and, likewise, should he be ordered to omit work as required by this Agreement, the cost of the work omitted shall be deducted from the Contract Amount. In either case, the cost of additions or reductions shall previously be mutually agreed upon in writing by both Owner and Engineer before execution.


3.3 A breakdown of the estimated Labor Cost and estimated Cost of Bill of Materials to be used are in Appendix--.