Document type



Download 0.73 Mb.
View original pdf
Page14/112
Date24.01.2022
Size0.73 Mb.
#58119
1   ...   10   11   12   13   14   15   16   17   ...   112
CER 13283 Safety Case Guidelines
High Level Design
The High Level Design of the Petroleum Safety Framework as amended by the CER from time to time.
Independent Competent
Body
An independent organisation engaged by the petroleum undertaking, under the Compliance Assurance System, to execute a Facilities Verification, or Well Verification Scheme.
Major Accident
An event, such as a major emission, fire, explosion, impact or structural failure of Petroleum Infrastructure, resulting from uncontrolled developments in the course of petroleum activities that could lead to a serious danger to human health whether immediate or delayed. Serious danger implies events which could impact multiple persons, including members of the public and/or workforce.

Download 0.73 Mb.

Share with your friends:
1   ...   10   11   12   13   14   15   16   17   ...   112




The database is protected by copyright ©ininet.org 2024
send message

    Main page