Fuzhou World Bank Financed Projects Nanjiang Binlu, Phase-ii project of the Third Ring Road and Kuiqi Bridge environmental impact report


Construction scale and investment



Download 3.93 Mb.
Page7/48
Date13.07.2017
Size3.93 Mb.
#23223
1   2   3   4   5   6   7   8   9   10   ...   48

Construction scale and investment

2.1.9Construction scale and investment of Nanjiang Binlu

Nanjiang Binlu starts at the starting pile No.0+000 of Cangqianxilu, ends at the proposed Qianhengnanlu, with a total length of 5.23km. The proposed width of the road is 50m.

Total investment of the project is 692.4 million yuan. The project construction fund is proposed to be raised partially by self-financing and partially by borrowing from domestic banks and borrowing from the World Bank. For the source of construction fun, see Table 2.6-1.
Table 2.6-1 Financing scheme

Source of fund

Amount(ten thousand yuan)

Accounting for the total(%)

Financial allocations from Fuzhou municipality and raised by the project entity self

15628.78

22.6

Loan of domestic commercial banks

32839.26

47.4

Loan of World Bank

20772.02

30.0

Total

69240.06

100



2.1.10Construction scale and investment of the Phase-II Project of the Third Ring Road

The Phase-II Project of the Third Ring Road project starts from the north end of the proposed Wanbian Bridge and ends at Nanjiangbin Xiuxianlu, i.e. the south end of the proposed Minjiang Kuiqi Bridge. The total length of the road is 12.474km and the road width is 100 to 50m. The project is designed in accordance with urban speedway. Two interchanges and two grade separations will be for the road. And there will be a large bridge with a length of 420m and 8 medium and small bridges with total length of 316m along the road.


Total investment of the project is 1845.6864 million yuan. The project construction fund is proposed to be raised by self-financing of project entity, financial allocations from Fuzhou municipality, loan from domestic banks and loan from the World Bank. For the source of construction fun, see Table 2.6-2.
Table 2.6-2 Financing scheme

Source of fund

Amount(ten thousand yuan)

Accounting for the total(%)

Financial allocations from Fuzhou Municipality and raised by the project entity self

54470.59

30.00

Loan of domestic commercial banks

67633.49

37.00

Loan of World Bank

59464.56

33.00

Total

184568.64

100



2.1.11Construction scale and investment of Kuiqi Bridge

Total investment of the self-anchored suspension bridge scheme (recommended scheme) of Fuzhou Kuiqi Bridge Project is 461.1283 million yuan. The project construction fund is proposed to be raised by self-financing of project entity, financial allocations from Fuzhou Municipality, loan from domestic banks and loan from the World Bank. For the source of construction fund, see Table 2.6-3.


Table 2.6-3 Financing scheme

Source of fund

Amount(ten thousand yuan)

Accounting for the total(%)

Financial allocations from Fuzhou municipality

13833.85

30.00

Loan of domestic commercial banks

16139.49

37.00

Loan of World Bank

16139.49

33.00

Total

46112.83

100



Traffic forecast


For flow of road sections of Nanjiang Binlu on the whole day in characteristic years and during rush hours, see Table 2.7-1 and Table 2.7-2. For that of the Phase-II Project of the Third Ring Road see Table 2.7-3 and Table 2.7-4. For that of Kuiqi Bridge see Table 2.7-5.
Table 2.7-1 Bidirectional sectional flow of Nanjiang Binlu during rush hours (pcu)

Road section

2005

2010

2015

2020

2022

from Aofengzhou Bridge to Qianhengnanlu

1020

1355

1915

2016

2198

from Aofengzhou Bridge to Sanxianzhou Bridge

1528

2028

2459

2890

3075

Table 2.7-2 Bidirectional sectional flow of Nanjiang Binlu during whole day (pcu)



Road section

2005

2010

2015

2020

2022

from Aofengzhou Bridge to Qianhengnanlu

12755

16937

23685

25202

27475

from Aofengzhou Bridge to Sanxianzhou Bridge

19105

25352

30738

35123

38435

Table 2.7-3 Bidirectional sectional flow of the Phase-II Project of the Third Ring Road during rush hours (pcu)



Road section

2010

2020

2025

2028

Wanbian Bridge - Fuxialu

4591

5745

6664

7282

Fuxialu - Wanbian Bridge

4491

5596

6491

6549

Table 2.7-4 Bidirectional sectional flow of the Phase-II Project of the Third Ring Road on a whole day (pcu)



Road section

2010

2020

2025

2028

Wanbian Bridge - Fuxialu

56122

70218

81453

89006

Fuxialu - Wanbian Bridge

54881

68393

79336

80052

Table 2.7-5 Traffic Forecast for Kuiqi Bridge in Characteristic Years



Year

2010

2015

2020

2026

Traffic pcu/day

30156

48974

67792

78639

Based on the current composition features of the road transportation in Nantaidao Island area, current and future transportation policies, preliminary idea of Fuzhou logistics plan as well as future transportation development situation in Nantaidao Island area, and in view of the transportation features of the Phase-II Project of the Third Ring Road and Nanjiang Binlu and their functional variation in the near future, the composition of vehicles on Nantaidao Island in characteristic years is shown in the table below:


Table 2.7-6 Composition of vehicles on Nantaidao Island

Year

Passenger car

Taxi

Bus

Light truck

Truck

Total

2010

30

7

17

12

34

100

2020

35

8

14

12

31

100

2028

40

8

12

12

28

100