2.1.9Construction scale and investment of Nanjiang Binlu
Nanjiang Binlu starts at the starting pile No.0+000 of Cangqianxilu, ends at the proposed Qianhengnanlu, with a total length of 5.23km. The proposed width of the road is 50m.
Total investment of the project is 692.4 million yuan. The project construction fund is proposed to be raised partially by self-financing and partially by borrowing from domestic banks and borrowing from the World Bank. For the source of construction fun, see Table 2.6-1.
Table 2.6-1 Financing scheme
Source of fund
|
Amount(ten thousand yuan)
|
Accounting for the total(%)
|
Financial allocations from Fuzhou municipality and raised by the project entity self
|
15628.78
|
22.6
|
Loan of domestic commercial banks
|
32839.26
|
47.4
|
Loan of World Bank
|
20772.02
|
30.0
|
Total
|
69240.06
|
100
|
The Phase-II Project of the Third Ring Road project starts from the north end of the proposed Wanbian Bridge and ends at Nanjiangbin Xiuxianlu, i.e. the south end of the proposed Minjiang Kuiqi Bridge. The total length of the road is 12.474km and the road width is 100 to 50m. The project is designed in accordance with urban speedway. Two interchanges and two grade separations will be for the road. And there will be a large bridge with a length of 420m and 8 medium and small bridges with total length of 316m along the road.
Total investment of the project is 1845.6864 million yuan. The project construction fund is proposed to be raised by self-financing of project entity, financial allocations from Fuzhou municipality, loan from domestic banks and loan from the World Bank. For the source of construction fun, see Table 2.6-2.
Table 2.6-2 Financing scheme
Source of fund
|
Amount(ten thousand yuan)
|
Accounting for the total(%)
|
Financial allocations from Fuzhou Municipality and raised by the project entity self
|
54470.59
|
30.00
|
Loan of domestic commercial banks
|
67633.49
|
37.00
|
Loan of World Bank
|
59464.56
|
33.00
|
Total
|
184568.64
|
100
|
2.1.11Construction scale and investment of Kuiqi Bridge
Total investment of the self-anchored suspension bridge scheme (recommended scheme) of Fuzhou Kuiqi Bridge Project is 461.1283 million yuan. The project construction fund is proposed to be raised by self-financing of project entity, financial allocations from Fuzhou Municipality, loan from domestic banks and loan from the World Bank. For the source of construction fund, see Table 2.6-3.
Table 2.6-3 Financing scheme
Source of fund
|
Amount(ten thousand yuan)
|
Accounting for the total(%)
|
Financial allocations from Fuzhou municipality
|
13833.85
|
30.00
|
Loan of domestic commercial banks
|
16139.49
|
37.00
|
Loan of World Bank
|
16139.49
|
33.00
|
Total
|
46112.83
|
100
|
Traffic forecast
For flow of road sections of Nanjiang Binlu on the whole day in characteristic years and during rush hours, see Table 2.7-1 and Table 2.7-2. For that of the Phase-II Project of the Third Ring Road see Table 2.7-3 and Table 2.7-4. For that of Kuiqi Bridge see Table 2.7-5.
Table 2.7-1 Bidirectional sectional flow of Nanjiang Binlu during rush hours (pcu)
Table 2.7-2 Bidirectional sectional flow of Nanjiang Binlu during whole day (pcu)
Road section
|
2005
|
2010
|
2015
|
2020
|
2022
|
from Aofengzhou Bridge to Qianhengnanlu
|
12755
|
16937
|
23685
|
25202
|
27475
|
from Aofengzhou Bridge to Sanxianzhou Bridge
|
19105
|
25352
|
30738
|
35123
|
38435
|
Table 2.7-3 Bidirectional sectional flow of the Phase-II Project of the Third Ring Road during rush hours (pcu)
Road section
|
2010
|
2020
|
2025
|
2028
|
Wanbian Bridge - Fuxialu
|
4591
|
5745
|
6664
|
7282
|
Fuxialu - Wanbian Bridge
|
4491
|
5596
|
6491
|
6549
|
Table 2.7-4 Bidirectional sectional flow of the Phase-II Project of the Third Ring Road on a whole day (pcu)
Road section
|
2010
|
2020
|
2025
|
2028
|
Wanbian Bridge - Fuxialu
|
56122
|
70218
|
81453
|
89006
|
Fuxialu - Wanbian Bridge
|
54881
|
68393
|
79336
|
80052
|
Table 2.7-5 Traffic Forecast for Kuiqi Bridge in Characteristic Years
Year
|
2010
|
2015
|
2020
|
2026
|
Traffic pcu/day
|
30156
|
48974
|
67792
|
78639
|
Based on the current composition features of the road transportation in Nantaidao Island area, current and future transportation policies, preliminary idea of Fuzhou logistics plan as well as future transportation development situation in Nantaidao Island area, and in view of the transportation features of the Phase-II Project of the Third Ring Road and Nanjiang Binlu and their functional variation in the near future, the composition of vehicles on Nantaidao Island in characteristic years is shown in the table below:
Table 2.7-6 Composition of vehicles on Nantaidao Island
Year
|
Passenger car
|
Taxi
|
Bus
|
Light truck
|
Truck
|
Total
|
2010
|
30
|
7
|
17
|
12
|
34
|
100
|
2020
|
35
|
8
|
14
|
12
|
31
|
100
|
2028
|
40
|
8
|
12
|
12
|
28
|
100
|