Guizhou Cultural and Natural Heritage Protection and Development Project Environmental Impact Assessment Guiyang Hydropower Investigation Design & Research Institute China Hydropower Engineering Consultation Group Corporation September 18



Download 1.45 Mb.
Page5/20
Date19.05.2018
Size1.45 Mb.
#48929
1   2   3   4   5   6   7   8   9   ...   20

Overview of the Project

This project consists of 4 components: cultural heritage protection in minority villages and ancient towns; natural heritage protection and utilization; tourism service facilities in gateway cities; and technical assistance.



      1. Minority Cultural Heritage Protection in Villages

The project includes 12 sub-projects and involves 17 villages distributed across 9 counties in Anshun city, Qiandongnan prefecture, and Qianxinan prefecture.


The project components include:

  • Construction of infrastructure in the villages, such as pathways, fire-fighting facilities, sewage treatment plants, garbage collection methods, and sanitation facilities

  • Repair and maintenance of ancient public buildings

  • Repair of old residential houses and renovation of other homes that will be used for display purposes; construction of a village cultural exhibition center and a tourist center

  • Construction of signs and rest facilities

  • Support for intangible heritage protection

  • Small loans to guesthouses and family workshops in the villages



      1. Ancient Town Protection

There are 4 sub-projects focusing on ancient towns: (1) the Jiuzhou Ancient Town in Anshun City, an example of Chinese fortress culture, (2) the Jiuzhou Ancient Town in Huangping County, an example of cultural integration between the Miao ethnic minority and the Han majority, (3) the Shidong Ancient Town, an example of traditional silver jewelry and pottery culture, and (4) the Longli Ancient Town, another example of Han fortress culture. These ancient towns are distributed across 4 counties of Anshun city and Qiandongnan prefecture.


The project components include:

  • Construction of infrastructure in communities

  • Repair of historic public buildings

  • Renovation of old residential houses

  • Construction of new cultural exhibition center, folk museum, and tourist center, as well as construction of signs and tourism service facilities

  • Intangible cultural heritage protection and training of local people



      1. Natural Heritage Protection and Utilization

There are 4 sub-projects involving a total of 2 national geologic parks and 2 national scenic areas: Guanling National Geo-park, Xingyi National Geo-park, Wanfenglin National Scenic Area, and Shamuhe National Scenic Area. These sub-projects are distributed across 4 counties of Anshun city, Qiandongnan prefecture, and Qianxinan prefecture.


The project components include:

  • Construction of infrastructure, such as pathways and sewage treatment facilities

  • Improvement and extension of exhibition spaces, as well as facilities for information, security, and first-aid.

  • Improvement of tourism service facilities

  • Intangible cultural heritage protection and training of local people

  • Development of minority villages and communities.



      1. Heritage Protection and Tourism Service Facilities Construction in Gateway Cities

There are 5 sub-projects, including:



  • heritage protection and tourism research center in Guiyang city (including tourist information center)

        • heritage protection and tourism research center

        • folk handicraft research and training center

        • a comprehensive website covering all of the tourism sites in Guizhou.




  • ethnic minority historic and cultural museums in Kaili county of Qiandongnan prefecture

        • the minority historic and cultural museum of Kaili county will centralize and display the cultural and natural heritage of Qiandongnan prefecture; it will also promote the research of heritage protection and development.




  • tourist information centers in the important ethnic minority autonomous towns in Liping county, Jianhe county, and Leishan county.

        • the tourist information centers in Guiyang and the other 3 counties can provide integrated tourism information which can help the tourists comprehend the meaning and importance of local heritage; this will ultimately benefit the local minority population.



      1. Technical Assistance

This includes:



  • capacity building for project management and supervision

  • assist the communities in the implementation of this project

  • help to establish guidelines for historic building maintenance and repair

  • help prepare manuals for heritage protection

  • training and study

  • help compile the Guizhou Tourism Master Plan.



    1. Description of Project




      1. Location and Investment

This proposed project is to be built in Guiyang city, Anshun city, Qiandongnan prefecture and Qianxinan prefecture. All of the components are located within 4 of the 5 Integrated Clusters specified in the Guizhou Tourism Development Master Plan as discussed in Section 4.1.1. The construction locations are shown in the figures from 3.3-1 to 3.3-5. Details of the components are given in Table 3.3-1 below.




City

Name of Components

Construction Sites

Construction description

Anshun city

Tianlong fortress cultural heritage protection

Tiantaishan Tianlong fortress of Tianlong town, Pinba county

Pathway, drainage system, garbage collection and transfer station, power facility, traditional house maintenance and protection, demonstration model house construction, tourist information center, fortress culture exhibition hall, intangible culture heritage protection and training.

Jiuzhou fortress cultural heritage protection

Yunshan village, Benzai village and Jiuxi village of Qiyanqiao town, Xixiu district

Pathway, car park, fire fighting system, drainage pipe, garbage collection and transfer station, public toilet, river improvement, public signs, traditional house maintenance and protection, demonstration model house construction, museum, tourist information center, ancient building repair, intangible culture heritage protection and training.

Guanling national geological park heritage protection

Tanshan of Xinpu village, Guanling county 1

Ancient site exhibition facilities, archaeological site exhibition, Triassic ichthyosaur exhibition hall, rock and green area of Triassic park, scientific work station, tourist information center, public signs, exhibition pathway, car park, garbage collection system, public toilet, training and education.

Qiandongnan prefecture

Biasha village cultural heritage protection

Biasha village, Congjiang county

Pathway, car park, sewage treatment station, drainage system, fire fighting facility, garbage collection system, protection and repair of Lusheng grounds, planting trees, power supply alteration, traditional Miao house protection

Duliujiang Dong cultural heritage protection

Zenchong village and Xiaohuang village, Congjiang county

Pathway, car park, water supply facility, drainage system, sewage treatment station, fire fighting facility, water environment improvement, garbage collection and transfer system, public toilet, planting trees, traditional Dong house protection, Xiaohuang traditional culture exhibition center, public signs, intangible culture protection.

Danzai Miao cultural heritage protection

Shiqiao village, Danzai county

Pathway, car park, water supply facility, drainage system, fire fighting facility, garbage collection system, public toilet, water environment improvement, village environment improvement, paper manufacture workshop protection, family paper workshop protection, traditional hotel construction, ancient village gate repair, public signs, tourist information and service center.

Jiuzhou ancient city heritage protection

Jiuzhou town, Huangping county

Ancient street renovation, drainage system, sewage treatment facility, garbage collection and transfer system, ancient building maintenance, fire fighting facility, public signs, intangible cultural heritage protection and training.

Yangasha national cultural region heritage protection

Wubao village, Balang village and Wenquan village of Guanme town, Raohao village of Nanzai town, Liuji village of Nanjia town, Jianhe county

Pathway, car park, water supply and drainage system, weather bridge, sewage treatment facility, fire fighting facility, garbage collection system, public toilet, traditional houses and village gate repair, village environment improvement, planting trees, stannous embroidery exhibition center.

Longli ancient city heritage protection

Longli ancient city of Longli town, Jinping county

Pathway, drainage system, sewage treatment facility, fire fighting facility, traditional house repair, water environment improvement, village environment improvement, public signs, tourist information and service center, intangible cultural heritage protection.

Bala river Miao cultural heritage protection in Kaili region

Jidao, Huaienbao, Longjing of Kaili city

Pathway, car park, weather bridge, water supply and drainage system, sewage treatment facility, fire fighting facility, garbage collection system, public toilet, power supply alteration, traditional house and ancient building repair, minority culture and tourist information center, tourism service facility.

Bala river Miao cultural heritage protection in Kaili region in Leishan region

Langdeshangzai, maomaohe, nanmeng, jiaomeng of Leishang county

Pathway, car park, fire fighting facility, garbage collection system, public toilet.

Xijiang Miao cultural heritage protection

Xijiang town, Leishan county

Pathway, car park, drainage system, sewage treatment facility, fire fighting facility, garbage collection and transfer system, public toilet, traditional house repair, tourist information center, village gate, landscape platform, folk performance grounds, Timbal and Lusheng grounds, intangible cultural heritage protection.

Zhaoxing Dong cultural heritage protection

Zhaoxing, Tang’an, jitang, xiage of Zhaoxing town, Liping county

Street, pathway, riverbank, water supply and drainage system, sewage treatment facility, fire fighting facility, garbage collection system, first-aid station, traditional house repair, demonstration model house construction.

Shanmu river cultural and natural heritage protection

Shibing county

Road, pathway, car park, bridge, port, water supply and drainage system, sewage treatment facility, garbage collection and transfer system, public toilet, video monitoring system, first-aid facility, public signs, management office building.

Shidong cultural heritage protection

Shidong town, Taijiang county

Pathway, car park, water supply and drainage system, sewage treatment facility, garbage collection and transfer system, public toilet, traditional house and ancient building repair, minority craft exhibition hall, information center, public signs, river bank protection, intangible cultural heritage protection.

Sanmentang cultural heritage protection

Sanmentang village, Tianzhu county

Pathway, water supply and drainage system, sewage treatment facility, garbage collection and transfer system, traditional house and ancient building repair, ancient steel and port protection, tourist information center, management office building, folk culture and performance grounds, intangible cultural heritage protection.

Ethnic minorities culture and history museum

Kaili county

Minority culture museum, car park, landscape improvement

Liping tourism information center

Liping county

Tourist information center

Jianhe tourism information center

Jianhe county

Tourist information center, car park, water supply and drainage system, garbage collection and transfer station, public toilet, planting trees, intangible cultural heritage protection.

Qianxinan prefecture

Xingyi national geo park and Dingxiao Guizhou dragon heritage protection

Dingxiao development area of Xingyi county2

Fossil museum and square, training items.

Maling river canyon and Wanfeng lake national scenic spot cultural and natural heritage protection

Xingyi county

Pathway, gate, bridge, car park, river bank, water supply and drainage system, sewage treatment facility, public toilet, garbage collection and transfer system, traditional house repair, ancient tree protection, village environment improvement, performance grounds, Buyi culture center, tourism service center, intangible cultural heritage protection and training.

Buyi cultural and natural heritage protection

Zhenfeng county

Pathway, water supply and drainage system, sewage treatment facility, planting trees, dancing grounds, traditional house repair, demonstration model house construction, Buyi culture center, intangible cultural heritage protection and training.

Guiyang city

Guizhou cultural and natural protection development center

Guizhou Normal University

Guizhou cultural and natural heritage protection and development center

Guizhou tourism capability development

Guizhou Tourism Agency

Capacity building

Figure 3.3-1 The Prefectures Boundary Map of Guizhou


Figure 3.3-2 Structure Plan Map of Anshun Integrated Tourism Area

Figure3.3-3 Structure Plan Map of Kaili-Zhenyuan Integrated Tourism Area


Figure 3.3-4 Structure Plan Map of Liping-Congjiang-Rongjiang Integrated Tourism Area
Figure 3.3-5 Structure Plan Map of Xingyi-Anlong Integrated Tourism Area
      1. Description of Facilities

The summary information of the components’ locations, scales and contents are listed in Table 3.3-2 and Annexed Table 1.


Table 3.3-2 Typical Construction Contents

Facility

Quantity

Scale

General information

Number of involved component sites

Garbage collection stations

16

The area of each station is 100m2

The transport capability is 10t/d

9

Public toilets

55

The area of each toilet varies from 60m2 to 450m2

Most toilets have a capacity of 12 persons, while some small toilets have a capacity of 5 persons.

20

Sewage treatment facilities

23

The treatment capability of each station varies from 50m3/d to 5000m3/d

The sewage will be disposed by integrated treatment facilities using technology for sedimentation, biological and chemical reactions.

20

Museum

3

The area of each museum varies from 2000m2 to 10000m2

For the exhibition of fossils, folk culture, local culture and handicrafts.

3

Tourist information center

10

The area of each center varies from 250m2 to 1000m2

For training, exhibition and resting.

10

Parking lot

20

The area of each car park varies from 500m2 to 5000m2

The locations of the car parks must conform to local plans. Most of the car parks are new construction, except the one in Xifenglin scenic area, which is an extension.

19

Riverbed clean

7

The maximum length of the river is 4.7km

Make pathways along the bank, clean riverbed, preserve landscape, illuminate at night

7



      1. Generic Design

The environmental facilities to be built in the component sites take a generic design approach that follows the criteria below:



  • Have adapted to local conditions

  • Have been proven in operation

  • Represent the least cost option

  • Comply with environmental standards



A. Solid Waste Collection and Transfer Facility
The municipal solid waste will be collected from garbage bins placed at tourism facilities and areas. The local environmental sanitation team will be responsible for collecting the solid waste from the bins and moving it to the transferring stations (which will be constructed during the project) on a regular basis. The collection station consists of concrete tanks lined with cement and a loading area for truck access, which will provide the space for large vehicles to begin hauling solid waste to the county landfill facility. The size of the tanks is designed based on the expected quantity of visitors.
B. Public Toilets
Water-flushing toilets will be used. These comprise a water storage system and septic tanks. The waste collected in the septic tanks is generally collected either by the local sanitation team or by farmers, who use them for compost and (subsequently) for agricultural applications.
C. Sewage Collection and Treatment Facility
Domestic wastewater will be collected at the wastewater treatment station via open ditches. As in the rural regions of the project area, industrial wastewater flow is virtually negligible, since the wastewater is low in COD but high in NH3-N. Thus, there is no concern over industrial hazardous constituents in the water flow; a simple land treatment system is used to treat the wastewater to maintain standards.
Each wastewater treatment station consists of the primary treatment units and an overflow system, but not followed on by disinfection units. The wastewater is initially settled in a retarding pond to reduce the load of SS, and then it is introduced to a vegetated land and is allowed to flow very slowly down the vegetated slope and collected in a ditch. Retention time of the wastewater generation is from 10 days to 15 days. To eliminate nitrogen from the flow, the vegetation will be harvested each year.
D. Parking lot
Car parking lots will be provided in the peripheral area of each component site. As the project is largely on a karst landform (which is low in ecological vulnerability but still sensitive to land disturbance), the car parking yards are paved with porous materials that allow for vegetative establishment, rather than the asphalt that is used in conventional parking lots. Landscape and visual considerations have been factored into the design of the car parks; open spaces nearby are preserved for planting trees.
E. Riverbed cleaning
The improvement of the river (which runs 4.8 km) includes sediment dredging, embankment by stones and rocks, pedestrian pathways, and lights.

      1. Typical and Special Works

Although the works under the project vary in size and location, they can be classified into several groups; an example from each group is summarized below.


A. Solid Waste Collection Station
One of the examples for solid waste collection stations is to be constructed under the Tianlong Fortress component.
This component is located in the scenic area of Tianlong fortress. There are 2548 local residents and each one will produce 1.2kg garbage per day. The tourists are projected to reach 3000 people/day in the area and each one will produce 0.5kg solid waste per day. The total amount of solid waste generated per day will be 4t. About 80 garbage bins will be distributed around the village, and they will take up a total area of 80 m2. Two solid waste transfer stations will be constructed adjacent to the main entrances of Tianlong Fortress Scenic Area; each station will have an area of 100m2. The stations will collect 40m3 of garbage in the scenic area in their service area of 3 km2. The architectural design of the two stations has taken into account the surrounding environment and the traditional style of other buildings. Figure 3.3-6 below shows the layout and image of the transfer station.
Figure 3.3-6 Solid Waste Collection Station
B. Public Toilet
One of the examples for public toilet construction is in Nachan village. The design of public toilets follows the Urban Public Toilet Planning and Design Standards. The construction of the toilets will use local materials and remain consistent with the local architectural style. The newly constructed public toilets will meet the increased demand of the whole scenic area. The toilets will be managed by the local government. The toilets are located on nationally-owned or collectively-owned unused land and do not involve resettlement or building demolishment. Figure 3.3-7 shows the layout and image of these public toilets.
Figure 3.3-7 Public Toilets
C. Sewage Treatment Station
One of the examples for sewage treatment stations is in the Wanfenglin National Scenic Area.
The capacity of the treatment station is based on the water demand projection and the conversion ratio into wastewater. Table 3.3-3 summarizes the design criteria for the wastewater treatment station.


Table 3.3-3 Parameters for Wastewater Treatment Station

Maximal water supply(t/d)

Daily variation coefficient

Average water supply(t/d)

Sewage conversion coefficient

Average sewage discharge

(t/d)


Required Treatment capability

(t/d)


782

1.3

601

80%

480

500

The sewage treatment station will be located downstream along the river and on the leeward side of the residential area. The location features desirable geological conditions, flood protection, convenience of sewage collection/conveyance/discharge, as well as good water and electricity supply. There will be an adequate area for an extension of the station in the future.


D. Museum
One of the examples for museums is the Guizhou Dragon Fossil Museum in Xingyi National Geo-Park.
The design of the museum follows the General Specifications of Civil Structure Design, Office Structure Design Specifications, Museum Design Specifications, Cultural Center Design Specifications, Village Structure Fire Protection Design Specifications, Urban Road and Structure Barrier-free Design Specifications, Public Structure Energy-saving Design Standards, and so on. The main function of museums is to promote scientific awareness.

This is a newly constructed middle-size museum. The museum is a 2 floor structure with a height of 12m and a floor area of 4,100m2. The planting and paving area is 1,500m2. The architecture is consistent with the local style. This museum will be located on nationally-owned unused land, and does not require resettlement of people. Picture 3.3-8 shows the image and layout of the museum.


Figure 3.3-8 Guizhou Dragon Fossil Museum



E. Tourist information Centers
One of the examples for tourist information centers is the information center in the Wanfenglin National Scenic Area.
The main functions of tourist information centers are tourism consultation, food services, conferences, resting areas, shopping and entertainment.. The design follows the General Clauses of Civil Structure Design, Office Structure Design Specifications, Hotel Design Specifications, Shop Design Specifications, Intelligent Structure Design Specifications, Structure Fire Protection Design Specifications, Urban Road and Structure Barrier-free Design Specifications, Public Structure Energy-saving Design Standards, and so on.
The construction of the tourist information centers will use local materials and remain consistent with the local architectural style. The newly constructed tourist information centers can meet the service requirement for the whole scenic area. The center will be located on nationally-owned or collectively-owned unused land and does not involve relocation of people or building demolition. Figure 3.3-9 shows the layout and image of the museum.
Figure 3.3-9 Wanfenglin Tourist Information Center



F. Parking Lot
One of the examples for parking lots is in the Guanling National Geo-Park.
The design of parking lot follows the Garage and Car Park Fire Protection Design Specifications with local ecological and landscape style. The ground is paved with porous materials and the area nearby is planted with flowers and trees. The car parks will be located on nationally-owned or collective-owned unused land and do not involve relocation of people or building demolition.
The parking lot is located at the entrance of the Guanlin Fossil National Geologic Park; it features facilities for gasoline-powered cars and for the battery-powered cars used in the park itself. The area of the car park is 5000m2. Figure 3.3-9 shows the layout and image of the parking lot.
Figure 3.3-9 Parking Lot for the Guanling National Geo-Park.



G. River cleaning
One of the examples for river cleaning programs is the component of Nahui River pathway construction and river bank regulation. The river cleaning program here will pave the river banks with a soft impermeable layer and also encourage vegetation. Figure 3.3-10 shows the design layout of the cleaning works.
Figure3.3-10 Nahui River Cleaning Works
H. Traditional House Repair
Two of the examples for Traditional House Repair are at Tianlong Fortress and Jiuzhou Fortress components. The repair of traditional houses follows the General Specifications of Civil Structure Design, Structure Fire Protection Design Specifications, Urban Road and Structure Barrier-free Design Specifications, Public Structure Energy-saving Design Standards, House Design Specifications and the local traditional architecture style.
These kinds of repairs target traditional houses and public buildings that are highlighted in the conservation plan approved by the relevant cultural heritage agencies. Figure 3.3-11 and 3.3-12 shows the image of the traditional house before repair and after repair respectively.
Figure 3.3-11 Traditional House Repair in Tianlong Fortress
Figure 3.3-12 Traditional House Repair in Jiuzhou Fortress



I. Water Supply
One of the examples for water supply facility is at Jiuzhou fortress. The design of the water supply facilities follows the Outdoor Drainage Design Specification, Construction and Acceptance Specification of Water Supply and Drainage Pipeline, Water Quality Standards of Sewage Discharged into the City Sewer, etc. The layout of pipelines is designed based on technical and financial analysis.
The specific criteria for pipeline designs are:


  • The pipeline system should be designed to match the drainage capability in the long run, since each associated facility will be completed step by step.

  • Make full use of the existing drainage systems along the roads and rivers.

  • The layout of pipeline should be adapted to the landscape.

  • The pipeline should be as straight as possible and deeply buried.

  • The above construction principles take the regional environment into consideration and will minimize the environmental impacts of the sub-project items.

Figure 3.3-13 shows the layout of water supply and drainage pipelines


Figure 3.3-14 shows the layout of water supply and drainage pipelines at Jiuzhou Fortress


      1. Construction Period

The construction period will be 4 years from September 2008 to September 2012.





  1. Download 1.45 Mb.

    Share with your friends:
1   2   3   4   5   6   7   8   9   ...   20




The database is protected by copyright ©ininet.org 2024
send message

    Main page