Introduction section1: general requirements



Download 2.29 Mb.
Page8/74
Date01.10.2024
Size2.29 Mb.
#64661
1   ...   4   5   6   7   8   9   10   11   ...   74
DEWA Regulations Book - UPDATED 2017

Isolation and switching





    • Isolators

  1. Presence and location of appropriate devices

  2. Capable of being secured in the OFF position

  3. Correct operation verified (functional check)

  4. The installation, circuit or part thereof that will be isolated clearly identified by location and/ or durable marking

  5. Warning notice posted in situation where live parts cannot be isolated by the operation of a single device

    • Switching off for mechanical maintenance

  1. Presence of appropriate devices

  2. Acceptable location - state if local or remote from equipment in question

  3. Capable of being secured in the OFF position

  4. Correct operation verified (functional check)

  5. The circuit or part thereof to be disconnected clearly identified by location and/ or durable marking

    • Emergency switching/stopping

  1. Presence of appropriate devices

  2. Readily accessible for operation where danger might occur

  3. Correct operation verified (functional check)

  4. The installation, circuit or part thereof to be disconnected clearly identified by location and/or durable marking

    • Functional switching

  1. Presence of appropriate devices

  2. Correct operation verified (functional check)



  1. Current–Using Equipment (Permanently Connected)





    • Suitability of equipment in terms of IP and fire ratings

    • Enclosure not damaged/deteriorated during installation so as to impair safety

    • Suitability for the environment and external influences

    • Security of fixing

    • Cable entry holes in ceilings above luminaires, sized or sealed so as to restrict the spread of fire

    • Provision of undervoltage protection, where specified

    • Provision of overload protection, where specified

    • Recessed luminaires (downlighters)

  1. Correct type of lamps fitted

  2. Installed to minimize build-up of heat

The inspection & testing certificate format shall be completed through the DEWA Getting Electricity online One Window System. The results include insulation resistance tests, continuity tests, earth electrode resistance tests, etc. as given in ‘Inspection & Testing Certificate’ in Appendix-2. Verification of the submitted test results will also be conducted during DEWA inspection.



    1. Download 2.29 Mb.

      Share with your friends:
1   ...   4   5   6   7   8   9   10   11   ...   74




The database is protected by copyright ©ininet.org 2024
send message

    Main page