MAINTENANCE, PERIODIC INSPECTION AND TESTING
Maintenance, periodic inspection and testing of every installation shall be carried out to ensure safety and satisfactory performance. The frequency of periodic inspection and testing of an installation shall be determined by the type of installation, its use and operation the frequency of maintenance and external influences to which it is subjected. Industrial and commercial installations shall at least be inspected every 2 years by an independent consultant/ contractor. the consultant/ contractor or person responsible for the maintenance, inspection and testing shall report to DEWA, in writing, any defects found in related parts of the existing installations and their rectification, together with a schedule of test result.
Following examples of items requiring inspection for an electrical installation status report can be referred, as applicableto the respective type of premises.
A visual inspection should firstly be made of the external condition of all electrical equipment which is not concealed.
Further detailed inspection, including partial dismantling of equipment as required, should be carried out as agreed with DEWA
These examples are given below:
Electrical intake equipment
Automatic disconnection of supply
Main earthing/ bonding arrangements
Presence of installation earth electrode arrangement
Adequacy of earthing conductor size
Adequacy of earthing conductor connections
Accessibility of earthing conductor connections
Adequacy of main protective bonding conductor sizes
Adequacy and location of main protective bonding conductor connections
Accessibility of all protective bonding connections
Provision of earthing/ bonding labels at all appropriate locations