PE-9 POWER EQUIPMENT AND CABLING


Control: The organization protects power equipment and power cabling for the information system from damage and destruction.

Supplemental Guidance: Organizations determine the types of protection necessary for power equipment and cabling employed at different locations both internal and external to organizational facilities and environments of operation. This includes, for example, generators and power cabling outside of buildings, internal cabling and uninterruptable power sources within an office or data center, and power sources for self-contained entities such as vehicles and satellites. Related control: PE-4.

Control Enhancements:

  1. power equipment and cabling | redundant cabling

The organization employs redundant power cabling paths that are physically separated by [Assignment: organization-defined distance].

Supplemental Guidance: Physically separate, redundant power cables help to ensure that power continues to flow in the event one of the cables is cut or otherwise damaged.

  1. power equipment and cabling | automatic voltage controls

The organization employs automatic voltage controls for [Assignment: organization-defined critical information system components].

References: None.

Priority and Baseline Allocation:

P1

LOW Not Selected

MOD PE-9

HIGH PE-9



PE-10 EMERGENCY SHUTOFF


Control: The organization:

  1. Provides the capability of shutting off power to the information system or individual system components in emergency situations;

  2. Places emergency shutoff switches or devices in [Assignment: organization-defined location by information system or system component] to facilitate safe and easy access for personnel; and

  3. Protects emergency power shutoff capability from unauthorized activation.

Supplemental Guidance: This control applies primarily to facilities containing concentrations of information system resources including, for example, data centers, server rooms, and mainframe computer rooms. Related control: PE-15.

Control Enhancements:

  1. emergency shutoff | accidental / unauthorized activation

[Withdrawn: Incorporated into PE-10].

References: None.

Priority and Baseline Allocation:

P1

LOW Not Selected

MOD PE-10

HIGH PE-10



PE-11 EMERGENCY POWER


Control: The organization provides a short-term uninterruptible power supply to facilitate [Selection (one or more): an orderly shutdown of the information system; transition of the information system to long-term alternate power] in the event of a primary power source loss.

Supplemental Guidance: Related controls: AT-3, CP-2, CP-7.

Control Enhancements:



  1. emergency power | long-term alternate power supply - minimal operational capability

The organization provides a long-term alternate power supply for the information system that is capable of maintaining minimally required operational capability in the event of an extended loss of the primary power source.

Supplemental Guidance: This control enhancement can be satisfied, for example, by the use of a secondary commercial power supply or other external power supply. Long-term alternate power supplies for the information system can be either manually or automatically activated.

  1. emergency power | long-term alternate power supply - self-contained

The organization provides a long-term alternate power supply for the information system that is:

  1. Self-contained;

  2. Not reliant on external power generation; and

  3. Capable of maintaining [Selection: minimally required operational capability; full operational capability] in the event of an extended loss of the primary power source.

Supplemental Guidance: This control enhancement can be satisfied, for example, by the use of one or more generators with sufficient capacity to meet the needs of the organization. Long-term alternate power supplies for organizational information systems are either manually or automatically activated.

References: None.

Priority and Baseline Allocation:

P1

LOW Not Selected

MOD PE-11


Directory: publications
publications -> Acm word Template for sig site
publications ->  Preparation of Papers for ieee transactions on medical imaging
publications -> Adjih, C., Georgiadis, L., Jacquet, P., & Szpankowski, W. (2006). Multicast tree structure and the power law
publications -> Swiss Federal Institute of Technology (eth) Zurich Computer Engineering and Networks Laboratory
publications -> Quantitative skills
publications -> Multi-core cpu and gpu implementation of Discrete Periodic Radon Transform and Its Inverse
publications -> List of Publications Department of Mechanical Engineering ucek, jntu kakinada
publications -> 1. 2 Authority 1 3 Planning Area 1
publications -> Sa michelson, 2011: Impact of Sea-Spray on the Atmospheric Surface Layer. Bound. Layer Meteor., 140 ( 3 ), 361-381, doi: 10. 1007/s10546-011-9617-1, issn: Jun-14, ids: 807TW, sep 2011 Bao, jw, cw fairall, sa michelson

Download 5.8 Mb.

Share with your friends:
1   ...   106   107   108   109   110   111   112   113   ...   186




The database is protected by copyright ©ininet.org 2024
send message

    Main page