OVERVIEW OF STUDY PHASES (SCOPING TO IMPLEMENTATION READINESS)
|
Phases: Deliverables
|
Description
|
Progress and Comment to Reviewer
|
Phase 1: Scoping - inception, report
|
Summary of proposed project
|
Done – 25 February 2014
|
Overview of available information
|
Done – 25 February 2014
|
Review Strategic and planning issues
|
Done – 25 February 2014
|
Review integration with other schemes
|
Done – 25 February 2014
|
Determine social /economic component
|
Done – 25 February 2014
|
Revision of scope of work for study
|
Done – 25 February 2014
|
Phase 2A: Technical feasibility
|
Demand analysis
|
|
Review of WC/WDM / use efficiency
|
|
Water quality analysis /review
|
|
Analysis of existing infrastructure
|
|
Identify various options
|
|
Define design /planning criteria
|
|
Feasibility of various options
|
|
Option analysis
|
|
Phase 2B: Preliminary design and research
|
Preliminary design
|
|
Limited field research / investigations
|
|
Water license application
|
|
Research for EIA approval process
|
|
Detailed cost estimates and time frames for implementation
|
|
O&M / asset management plans
|
|
Phase 3: Implementation ready study
|
Economic criteria
|
|
Institutional criteria
|
|
Financial criteria
|
|
Legal criteria
|
|
Social criteria / consumer acceptability
|
|
Stakeholder consensus
|
|
Calculate prioritisation template
|
|
|
Criteria
|
Comment
|
Project: financials
|
URV
|
|
Unit costs per MCUB
|
|
Total capital requirement
|
|
Phased capital implementation
|
|
Functional criticality
|
|
Cost per consumer benefitting
|
|
Environmental
|
Power requirements
|
|
Environmental risk-operational
|
|
Environmental risk-need
|
|
Strategic importance
|
Flagship project
|
|
Water scarcity
|
|
Economic growth priority
|
|
Waste water treatment plants
|
|
Water treatment plants
|
|
Refurbishment/asset management
|
|
Technical/ operation & maintenance
|
Personnel - qualifications
|
|
Personnel - experience
|
|
Blue drop status
|
|
Green drop status
|
|
Degree of stormwater ingress
|
|
Water demand management
|
Per capita consumption(l/c/day)
|
|
Non-revenue water
|
|
Unaccounted for water
|
|
Municipal/ procurement/ financial capacity
|
Supply chain management
|
|
Financial control
|
|
Implementation readiness
|
Implementation ready studies
|
|
EIA
|
|
Water license
|
|
Socio-economic value
|
Backlog-housing
|
|
Backlog - water
|
|
Backlog - sanitation
|
|
MIG - backlog of allocation
|
|
Economic portion benefitting
|
|
Co-funding available
|
|