OVERVIEW OF STUDY PHASES (SCOPING TO IMPLEMENTATION READINESS)

Phases: Deliverables

Description

Progress and Comment to Reviewer

Phase 1: Scoping - inception, report

Summary of proposed project

Done – 25 February 2014

Overview of available information

Done – 25 February 2014

Review Strategic and planning issues

Done – 25 February 2014

Review integration with other schemes

Done – 25 February 2014

Determine social /economic component

Done – 25 February 2014

Revision of scope of work for study

Done – 25 February 2014

Phase 2A: Technical feasibility

Demand analysis




Review of WC/WDM / use efficiency




Water quality analysis /review




Analysis of existing infrastructure




Identify various options




Define design /planning criteria




Feasibility of various options




Option analysis




Phase 2B: Preliminary design and research

Preliminary design




Limited field research / investigations




Water license application




Research for EIA approval process




Detailed cost estimates and time frames for implementation




O&M / asset management plans




Phase 3: Implementation ready study

Economic criteria




Institutional criteria




Financial criteria




Legal criteria




Social criteria / consumer acceptability




Stakeholder consensus




Calculate prioritisation template




OVERVIEW OF CRITERIA

Criteria

Comment

Project: financials

URV




Unit costs per MCUB




Total capital requirement




Phased capital implementation




Functional criticality




Cost per consumer benefitting




Environmental

Power requirements




Environmental risk-operational




Environmental risk-need




Strategic importance

Flagship project




Water scarcity




Economic growth priority




Waste water treatment plants




Water treatment plants




Refurbishment/asset management




Technical/ operation & maintenance

Personnel - qualifications




Personnel - experience




Blue drop status




Green drop status




Degree of stormwater ingress




Water demand management

Per capita consumption(l/c/day)




Non-revenue water




Unaccounted for water




Municipal/ procurement/ financial capacity

Supply chain management




Financial control




Implementation readiness

Implementation ready studies




EIA




Water license




Socio-economic value

Backlog-housing




Backlog - water




Backlog - sanitation




MIG - backlog of allocation




Economic portion benefitting




Co-funding available