Oil Tanker Construction



Download 1.08 Mb.
Page24/60
Date16.12.2020
Size1.08 Mb.
#54495
1   ...   20   21   22   23   24   25   26   27   ...   60
155646687-Oil-Tanker-Construction-Rules

Cargo equipments

  • At the positions for monitoring the cargo loading and discharging operations, the cargo lines are to be fitted with pressure gauges with a red mark denoting the maximum permissible working pressure.
  • Provision shall be made for the safe draining, gas-freeing and cleaning of the cargo line system.
  • Steam lines to the individual heating coils of the cargo tanks are to be fitted with screw-down non-return valves.
  • Means of testing the condensate for ingress of oil are to be fitted before the stop valves in the heating coil outlets.
  • The condensate from the heating system is to be returned to the feed water system via observation tanks.
  • Condensate observation tanks are to be arranged and equipped such that cargo residues in the condensate will not constitute a hazard in engine room or other gas safe spaces.

Download 1.08 Mb.

Share with your friends:
1   ...   20   21   22   23   24   25   26   27   ...   60




The database is protected by copyright ©ininet.org 2024
send message

    Main page