2.3
Upload to the CMMS
In this step, the Master Data Maintainer takes the results from the previous step, collates the data and, for Assets in the
Execute phase, arranges for it to be loaded into the CMMS.
When this is carried out as an improvement step during the
Asset’s Operate phase, the existing planned maintenance routines are adjusted.
This step shall include a quality review and sign off by the relevant Technical Authorities to ensure that SCE performance assurance tasks have been correctly represented in the CMMS.
EP 2009-9009
Restricted
24