Tools Measures listing Number Measure Industry Average Top Quartile Tracking Frequency 13.P.1 SCEs with performance standards in place and aligned 70% 100% Annually with Safety Critical Tasks in the CMMS Process map • Performance assurance tasks are optimised with planned maintenance/inspection tasks Performance assurance tasks are entered and maintained in the CMMS. • Assurance target values are entered and maintained in the CMMS. • Performance standards are accessible from the CMMS. • All changes to SCEs and performance standards are reflected in the CMMS. 2.1 2.2 2.3 2.4 Align maintenance strategy with assurance tasks Prepare performance assurance tasks Upload to the CMMS Setup FSR Best in class standard