2. Align with maintenance strategies• Plant Maintenance
Data Minimum Standard (EP 2007-5614).
• Engineering Information Specification (EIS)
(DEP 82.00.10.30-Gen).
2. Align with maintenance strategiesIn this section, the approved Operate phase performance standards are structured and
loaded into the CMMS withinPlanned Maintenance Routines against the relevant SCE.
During the Asset’s Execute phase, the RRM process takes into account the design and other requirements, and is applied to the SCEs to determine the routine maintenance strategy and performance assurance task frequency. This then provides the basis for performance checking at project handover and for managing performance assurance tasks in the Asset’s
Operate phase. In cases where an existing Asset’s performance assurance
requirements need improvement, this activity shall be carried out in the Asset’s Operate phase and will comprise a review and adjustment of existing maintenance plans in the CMMS
or the creation of additional plans.