The conversion plan should anticipate possible problems and ways to deal with them. Among the most frequently occurring problems are missing documents, mixed data formats
between current and new files, errors in data translation,
missing data or lost files, and situations that were overlooked during systems development. The conversion manager must guard against the omission of steps in the conversion. A checklist will prevent missed steps. Personnel absences must also be expected and adequate fallback plans specified. Conversion timing is challenging, since there are so
many aspects of the conversion, ranging from the installation of equipment to the ordering of forms and supplies.
9.5 Operating Plan: The operating plan is checking of all arrangements. It includes
reviewing conversion plans, verifying the delivery of equipment,
software, forms, preparing the site and preparing the data and files.
1.
Site Preparation Analysts often work with vendor personnel to outline site – preparation guidelines. Due importance should
be paid to electrical using, air conditioning needs,
humidity controls, space requirements, etc.