VI
PART II DESIGN REQUIREMENTS 7
Drainage Design and Considerations 7.1 Computation of Peak Runoff
27-29 7.2 Computation
of Discharge Capacity 30 7.3 Design Considerations
31
8
Integration of Adjacent Watercourses with Developments and ABC Waters Design Features within Developments 8.1 Integration of Adjacent Watercourses with Developments
32 8.2 Integration of ABC Waters Design Features within Developments
32-33
9
Drainage Structures and Facilities 9.1 Drain and Culvert
34 9.2 Transition
34 9.3 Curves and Bends
34 9.4
Sump for Drain Intersections 34 9.5 Drain Connection to Existing Drain
34 9.6 Maintenance Access for Drainage Reserve
35 9.7 Markers along Edge of Drainage Reserve
35 9.8
Drop-inlet Chambers, Inlet
Openings and Slot-Outlets 35 9.9 Safety Railings
35 9.10 Rungs in Drains
35 9.11 Grating over Closed Drain/Culvert
36 9.12 Entrance Culvert/Crossing
37 9.13 Live Loads on Drains
37
Share with your friends: