VII
PART III ENSURING THE INTEGRITY OF STORM WATER DRAINAGE SYSTEMS 11
Temporary Occupation Permit (TOP) 11.1 Compliance during Temporary Occupation Permit (TOP)
41
12
Certificate of Statutory Completion (CSC) 12.1 Drainage Works
According to Approved Plan 42 12.2 Supervision
42 12.3
Completion of Works 42 12.4
“As-Constructed” Drainage Drawing and Piling Record
42 12.5
Survey Plan 42 12.6 Defects Liability Period
43 12.7
Handing-over
of Drain 43
13
Maintaining the Integrity of Storm Water Drainage Systems including Flood Protection Measures 13.1 Responsibility of Developer/Owner/Managing Agent/MCST/Town Council
44 13.2 Declaration on
Storm Water Drainage Systems 44
VIII
Appendices Appendix 1 Drainage Reserve Requirements Appendix 2 Submission Requirements for Flood Protection Measures Appendix 3 Principles and Standards for Flood Protection of Underground Rapid Transit Systems,
Vehicular Underpasses, Road Tunnels and their Ancillary Buildings Appendix 4 Rainfall Intensity- Duration- Frequency Curves for Singapore Island Appendix 5 Submission Requirements for As Constructed Drainage Drawings
Share with your friends: