Activities performed:Led in planning the work and organizing the environmental team to:
1) Study the general environmental features of the area; 2) Conducted field reconnaissance of the proposed port and relevant transport infrastructure; 3) Designed Environmental Baseline Surveys for instrumental measurements of air, water & noise, and assessment of flora and fauna of the area; 4) Formulate recommendations for planning and design of port infrastructure and facilities; 5) Held meetings with mass people and sea surveys about the endangered species and their patters; 6) Coordinate all works relevant to the conduct of environmental and social assessment of the area with respect to the proposed project; 7) Collect and examine the environmental data and formulate EMP for the EIA report..