Proposed position


Name of assignment or project



Download 98.38 Kb.
Page6/76
Date04.03.2021
Size98.38 Kb.
#55993
1   2   3   4   5   6   7   8   9   ...   76
Sam's CV (current as of Aug 2019) Envi Only
Name of assignment or project: Techno-Economical feasibility Study of Mirasarai/Sithakunda Port

Year: Jan-Jun. 2018

Location: Dhaka & Chittagong, Bangladesh

Client: Chittagong Port Authority / Padeco – Ramboll - DDC

Main project features: Feasibility Study of Sikatunda Port for BEZA in Mirsarai

Position held: International Lead Environmental Specialist

Activities performed:Led in planning the work and organizing the environmental team to:

1) Study the general environmental features of the area; 2) Conducted field reconnaissance of the proposed port and relevant transport infrastructure; 3) Designed Environmental Baseline Surveys for instrumental measurements of air, water & noise, and assessment of flora and fauna of the area; 4) Formulate recommendations for planning and design of port infrastructure and facilities; 5) Held meetings with mass people and sea surveys about the endangered species and their patters; 6) Coordinate all works relevant to the conduct of environmental and social assessment of the area with respect to the proposed project; 7) Collect and examine the environmental data and formulate EMP for the EIA report..







Download 98.38 Kb.

Share with your friends:
1   2   3   4   5   6   7   8   9   ...   76




The database is protected by copyright ©ininet.org 2024
send message

    Main page