Engineering & Manufacturing Development • Phase Completion: • The EMD Phase ends when: • The design is stable • Systems meets requirements • (demonstrated through DT and early OT) • Manufacturing processes demonstrated and under control • Industrial production capabilities are reasonably available • System meets or exceeds all EMD Phase exit criteria and MS C entrance criteria Engineering & Manufacturing Development CPD Critical Design Review (CDR) B C NOTE: EMD will often continue past the initial production or fielding decision until all EMD activities have been completed and all requirements tested and verified


  1. Download 87.79 Kb.

    Share with your friends:
1   ...   17   18   19   20   21   22   23   24   ...   91




The database is protected by copyright ©ininet.org 2024
send message

    Main page