Terms specific to the Auction being conducted on behalf of Tata



Download 1.33 Mb.
View original pdf
Page10/23
Date10.05.2022
Size1.33 Mb.
#58763
1   ...   6   7   8   9   10   11   12   13   ...   23
Auction Catalogue Berger Paints-RDC-Devla-NOIDA Div auc dt.28th March 22 94350 1.10
ordering-in-the-rapid-evolution-of-food-delivery vf


Auction Methodology


Multivariable Seal Bid auction
 The material will be sold in a single lot (having multiple categories) and a single bidder will emerge as the winner
 The entire stock of materials is divided into various categories as shown in the auction catalogue

Page 7 of 16
 An estimated quantity with Unit of Measurement (UOM) has been provided against each category
 Customers will have to place their quote in ₹ /UOM for the respective categories
 It is mandatory for every bidder to place bid in all the categories put up for auction. System will not accept any bid if quotes are not placed in all the categories
 A total value (summation of all the individual lot value) of all the lots of a bidder will be auto calculated and shown on the screen of the bidder
 System will decide the Hon the basis of Total Auction Value (basic value, i.e. the total value covering the value of all individual categories or lot as shown in table below
 System will allocate a rank to every bidder submitting bids. The rank will be allocated based on the total value of all the lots and the rank is dynamic. The higher is the total value, higher is the rank. Rank 1 is the highest rank. Any bidder having any rank below 1 can improve it by increasing his total lot value by bidding higher in individual categories/lots.
 The dispatches and invoicing would be on ₹ /UOM basis for respective categories
 If the actual quantity exceeds the estimated quantity during dispatch, the winning buyer will need to make extra payment for the additional quantity before lifting the material
 In case of shortage against the indicated quantity, buyer will get the refund from the seller
 Rate/UOM for the respective category will be the basis for calculating the amount of additional payment or refunds due to difference in final quantity and auctioned quantity Illustration for calculation of total auction value and selection of winning customer Category / Lot No Asset description Quantity UOM Customer A Rate in ₹
/UOM Customer B Rate in ₹
/UOM Total Price of A Total Price of B Cat 1 Material 1 2000 Litre
50 60 100000 120000 Cat 2 Material 2 1000 Litre
120 125 120000 125000 Cat 3 Material 3 500 Kg
80 90 40000 45000

Download 1.33 Mb.

Share with your friends:
1   ...   6   7   8   9   10   11   12   13   ...   23




The database is protected by copyright ©ininet.org 2024
send message

    Main page