|
Dumpsite Code
|
9
|
|
Person who conducted the survey
|
Dr Theologos Mimidis
|
|
Date of the survey
|
18th January 2011
|
1
|
Name of dumpsite
|
Lokbatan, Bina Shopping Center
|
2
|
Coordinates
|
40 17 59.5
49 44 53.4
|
3
|
Settlements which use the dumpsite
|
Shopping centers around the dumpsite
|
4
|
Municipality (-ies) or local authority (-ies) which use the dumpsite
|
Municipality of Garadagh
|
5
|
General description of the situation in the dumpsite
|
Located beside shopping center and developed in a dispersed and diffuse manner along the shores of nearby lake with formation waters, hydrocarbons and oil spills
|
6
|
Total years of operation of the dumpsite
|
8
|
7
|
Date of initiation
|
1993
|
8
|
Date of closure
|
It is not closed and still is fully operating
|
9
|
Years after closure (<15, 15< and <40, >40)
|
-
|
10
|
Area of dumpsite (in 1.000m2)
|
1000 m x 30 m = 30,000 m2
|
11
|
Type of waste disposed (define with percentages)
|
Mainly bags, carton boxes, containers, wrapping materials, broken goods. 70% plastics, 20% cartons, 3% ceramics and porcelains, 2% wood, 5% textiles, fabrics, woven, etc. (I)
|
12
|
Municipal waste, wastewater treatment sludge, sewage water
|
No
|
13
|
Inert and bulky
|
One month ago everything was bulky and very high. Now waste is compressed and the general picture gives the impression of a flat dump area. All waste materials are inert.
|
14
|
Green and agricultural
|
No
|
15
|
Medical waste, toxic waste, slaughter house waste
|
No
|
16
|
Other (describe)
|
Mainly shopping center refuge
|
17
|
Total volume (m3)
|
30,000 m2 x 1.20 m = 36,000 m3
|
18
|
Total quantity (tn)
|
12,000 tn
|
19
|
Disposal method (describe: dispersion, incineration, compaction, temporary cover frequency)
|
Mainly dispersion and compaction once a month
|
20
|
Quantity of gas generated
|
No gas is generated. 100% inert materials
|
21
|
Bedrock (main formation)
|
Intercalations of limestone and sand into clays, Upper Pliocene
|
22
|
Morphology of area (stream, valley, mountainside, level area, pit, quarry, other)
|
Flat area adjacent to a lake where formation waters and groundwaters are collected. The age of the lake is 60 – 70 years.
|
23
|
Hydraulic conductivity of capping (impermeable, moderate, free flow)
|
During operation solid waste was not covered by earthy materials. Capping does not exist.
|
24
|
Hydraulic conductivity of bedrock (impermeable, moderate, free flow)
|
Moderate
|
25
|
Distance from the aquifer (>10m, 2-10m, <2m, in the aquifer)
|
< 2 m
|
26
|
Site Distance from:
|
C
|
27
|
Settlements, schools, working places
|
No settlements, no schools, only working places and shopping centers.
|
28
|
Stream with permanent flow
|
No
|
29
|
Forest
|
No
|
30
|
Agricultural activities, pastures
|
No
|
31
|
Wells / boreholes
|
No
|
32
|
Sea shore
|
880 m from the Caspian sea shore line.
|
33
|
Other (describe)
|
Around the dumpsite exist two big shopping centers and two to three small.
|
34
|
Existing infrastructure
|
The city of Lokbatan at 3.37 Km. Also 45 m from shopping center premices and 0 m from the lake.
|
35
|
Fencing
|
No
|
36
|
Guard-house
|
Yes
|
37
|
Lining or collection of leachate
|
No
|
38
|
Fire safety measures - fire belt
|
Yes
|
39
|
Other (describe)
|
Littering from transported wastes of the main roads leading to the shopping centers.
|
40
|
Nuisances and Hazards
|
Nuisance: air transported materials into the lake. Hazards: No.
|
41
|
Odors and dust
|
Yes
|
42
|
Wind blown materials
|
Problems with air blown plastic bags.
|
43
|
Birds, rats, vermin, insects
|
Yes, especially during spring and summer seasons.
|
44
|
Fires
|
No
|
45
|
Rainfall values (<100mm, 100-200mm, >200mm)
|
100 – 250 mm
|
46
|
Stream flow (if applicable) through the site
|
No
|
47
|
Flood potential (1 in 10yrs, 1 in 50, 1 in 100)
|
1 in 10 yrs
|
48
|
Use of the receptor (no use, irrigation, drinking-recreation)
|
Aquifuge with no use
|
49
|
Sensitivity of the receptor (low, medium, high)
|
High
|
50
|
Expected impacts on the environment (e.g. odours, pollution of receptors, fires etc)
|
Water pollution, extinction of water life in the lake
|
51
|
Other information
|
Reclaiming land from the lake to build new shopping centers.
|