The ministry of economic development of the republic of azerbaijan rehabilitation and closure of unauthorized dump sites in the greater baku area environmental



Download 4.64 Mb.
Page27/82
Date06.08.2017
Size4.64 Mb.
#27742
1   ...   23   24   25   26   27   28   29   30   ...   82

1.14Site 14




Unauthorised Dumpsites Questionnaire - Greater Baku Area




Dumpsite Code

14




Person who conducted the survey

Prof. Dr. Theologos Mimidis




Date of the survey

19/01/11

1

Name of dumpsite

Surakhani, Zighl landfield

2

Coordinates

40 32 31,1

50 00 04,4



3

Settlements which use the dumpsite

It was used by Surakhani and Qaracuxur

4

Municipality (-ies) or local authority (-ies) which use the dumpsite

Municipality of Surakhani

5

General description of the situation in the dumpsite

Old dumpsite where automobile old tires nearly everywhere

6

Total years of operation of the dumpsite

20

7

Date of initiation

1991

8

Date of closure

Semi-closed

9

Years after closure (<15, 15< and <40, >40)

-

10

Area of dumpsite (in 1.000m2)

200 m x 100 m = 20,000 m2

11

Type of waste disposed (define with percentages)

70% demolition and construction materials, 20% old tires, 5% domestic waste, 5% animal waste

H


12

Municipal waste, wastewater treatment sludge, sewage water

Municipal

13

Inert and bulky

Yes

14

Green and agricultural

Green pasture, no agricultural

15

Medical waste, toxic waste, slaughter house waste

No

16

Other (describe)

A ravine crosses the site and a big excavation to the water table

17

Total volume (m3)

20,000 m2 x 1m = 20,000 m3

18

Total quantity (tn)

6,500 tn

19

Disposal method (describe: dispersion, incineration, compaction, temporary cover frequency)

Dispersion, compaction, temporary capping at the largest part

20

Quantity of gas generated

Very small

21

Bedrock (main formation)

Limestone with sands. A Middle Quaternary, aquifer

22

Morphology of area (stream, valley, mountainside, level area, pit, quarry, other)

Ravine and pit like excavations

23

Hydraulic conductivity of capping (impermeable, moderate, free flow)

Moderate

24

Hydraulic conductivity of bedrock (impermeable, moderate, free flow)

Free flow

25

Distance from the aquifer (>10m, 2-10m, <2m, in the aquifer)

<2 m

26

Site Distance from:

R

27

Settlements, schools, working places

700 m, 2.5 km , 250m

28

Stream with permanent flow

Yes

29

Forest

No

30

Agricultural activities, pastures

No, yes

31

Wells / boreholes

No

32

Sea shore

5 km

33

Other (describe)

Due to an illegal clay quarry, a remnant excavation to the water table creating a small artificial lake

34

Existing infrastructure

Zigh highway

35

Fencing

No

36

Guard-house

No

37

Lining or collection of leachate

No

38

Fire safety measures - fire belt

No

39

Other (describe)

To be closed completely for preventing illegal dumping

40

Nuisances and Hazards

Yes

41

Odors and dust

No

42

Wind blown materials

Yes

43

Birds, rats, vermin, insects

No, yes, no, yes

44

Fires

No

45

Rainfall values (<100mm, 100-200mm, >200mm)

< 100 mm

46

Stream flow (if applicable) through the site

Yes

47

Flood potential (1 in 10yrs, 1 in 50, 1 in 100)

1 in 50 yrs

48

Use of the receptor (no use, irrigation, drinking-recreation)

Aquifer with no use

49

Sensitivity of the receptor (low, medium, high)

High

50

Expected impacts on the environment (e.g. odours, pollution of receptors, fires etc)

Pollution of receptor with leachates

51

Other information

Remediation of the aquifer in emergency



Photograph 14: Site 14



Download 4.64 Mb.

Share with your friends:
1   ...   23   24   25   26   27   28   29   30   ...   82




The database is protected by copyright ©ininet.org 2024
send message

    Main page