The ministry of economic development of the republic of azerbaijan rehabilitation and closure of unauthorized dump sites in the greater baku area environmental



Download 4.64 Mb.
Page34/82
Date06.08.2017
Size4.64 Mb.
#27742
1   ...   30   31   32   33   34   35   36   37   ...   82

1.21Site 23




Unauthorised Dumpsites Questionnaire - Greater Baku Area




Dumpsite Code

23




Person who conducted the survey

Prof. Dr. Theologos Mimidis




Date of the survey

26/2/2011

1

Name of dumpsite

Buzovna

2

Coordinates

40 31 06.2

50 07 31.6



3

Settlements which use the dumpsite

Buzovna settlement and seaside residences.

4

Municipality (-ies) or local authority (-ies) which use the dumpsite

Municipality of Khazar

5

General description of the situation in the dumpsite

Mainly municipal and construction waste completely mixed.

6

Total years of operation of the dumpsite

10 years

7

Date of initiation

2001

8

Date of closure

Active site

9

Years after closure (<15, 15< and <40, >40)

-

10

Area of dumpsite (in 1.000m2)

180 m x 80 m = 14,400 m2

11

Type of waste disposed (define with percentages)

55% municipal waste, 30% construction waste, 5% rubble and 5% metallic. (I)

12

Municipal waste, wastewater treatment sludge, sewage water

Municipal waste yes, wastewater treatment sludge no, sewage water no

13

Inert and bulky

Partially inert, bulky

14

Green and agricultural

Green wetland with no agricultural activities.

15

Medical waste, toxic waste, slaughter house waste

No

16

Other (describe)

A green habitat of delta shape mainly active during the wet period.

17

Total volume (m3)

14400 m2 x 0.45 m = 6,480 m3

18

Total quantity (tn)

2,000 tn

19

Disposal method (describe: dispersion, incineration, compaction, temporary cover frequency)

Dispersion, temporary cover at places from rubble and tailing materials, incineration at small level

20

Quantity of gas generated

Very low

21

Bedrock (main formation)

Shelly limestone and sands (Upper Quartenary)

22

Morphology of area (stream, valley, mountainside, level area, pit, quarry, other)

Lake shore of very low relief

23

Hydraulic conductivity of capping (impermeable, moderate, free flow)

-

24

Hydraulic conductivity of bedrock (impermeable, moderate, free flow)

Moderate

25

Distance from the aquifer (>10m, 2-10m, <2m, in the aquifer)

<2 m

26

Site Distance from:

S

27

Settlements, schools, working places

110 m from settlements,50 m from Ali Ayaghi sanctuary and 500 m from school.

28

Stream with permanent flow

Stream with no permanent flow

29

Forest

450 m from small grove

30

Agricultural activities, pastures

No

31

Wells / boreholes

Yes

32

Sea shore

450 m

33

Other (describe)

2.5 km from Baku’s rigs.

34

Existing infrastructure

Resort, water pipe, gas pipe

35

Fencing

No

36

Guard-house

No

37

Lining or collection of leachate

No

38

Fire safety measures - fire belt

No

39

Other (describe)

Nearby lake and seaside recreation

40

Nuisances and Hazards

Yes

41

Odors and dust

Odors Yes, Dust Yes

42

Wind blown materials

Yes

43

Birds, rats, vermin, insects

Yes

44

Fires

Yes

45

Rainfall values (<100mm, 100-200mm, >200mm)

< 100 mm

46

Stream flow (if applicable) through the site

No

47

Flood potential (1 in 10yrs, 1 in 50, 1 in 100)

1 in 10 years

48

Use of the receptor (no use, irrigation, drinking-recreation)

Aquifer for potable water

49

Sensitivity of the receptor (low, medium, high)

High for all receptors

50

Expected impacts on the environment (e.g. odours, pollution of receptors, fires etc)

Very high

51

Other information

A dumpsite is unacceptable near a resort.



Photograph 21: Site 23



Download 4.64 Mb.

Share with your friends:
1   ...   30   31   32   33   34   35   36   37   ...   82




The database is protected by copyright ©ininet.org 2024
send message

    Main page