The ministry of economic development of the republic of azerbaijan rehabilitation and closure of unauthorized dump sites in the greater baku area environmental



Download 4.64 Mb.
Page49/82
Date06.08.2017
Size4.64 Mb.
#27742
1   ...   45   46   47   48   49   50   51   52   ...   82

1.36Site 41




Unauthorised Dumpsites Questionnaire - Greater Baku Area




Dumpsite Code

41




Person who conducted the survey

Prof. Dr. Theologos Mimidis




Date of the survey

23/02/2011

1

Name of dumpsite

Kurdakhani

2

Coordinates

40 30 55,0

49 56 10,1



3

Settlements which use the dumpsite

Kurdakhani village

4

Municipality (-ies) or local authority (-ies) which use the dumpsite

Municipality of Sabunchu

5

General description of the situation in the dumpsite

Small dumpsite with construction waste transported to the site by big and small trucks

6

Total years of operation of the dumpsite

2

7

Date of initiation

2009

8

Date of closure

-

9

Years after closure (<15, 15< and <40, >40)

-

10

Area of dumpsite (in 1.000m2)

40 m x 30 m = 1,200 m2

11

Type of waste disposed (define with percentages)

80% construction, 20% household waste (H)

12

Municipal waste, wastewater treatment sludge, sewage water

No, no, no

13

Inert and bulky

Yes

14

Green and agricultural

No

15

Medical waste, toxic waste, slaughter house waste

No

16

Other (describe)

New houses Muhammad gate

17

Total volume (m3)

600 m2 x 1 m = 1,200 m3

18

Total quantity (tn)

400 tn

19

Disposal method (describe: dispersion, incineration, compaction, temporary cover frequency)

Deposition

20

Quantity of gas generated

No

21

Bedrock (main formation)

Limestone, sands, clay interbeds, aquifer, Upper Pliocene

22

Morphology of area (stream, valley, mountainside, level area, pit, quarry, other)

Level area

23

Hydraulic conductivity of capping (impermeable, moderate, free flow)

-

24

Hydraulic conductivity of bedrock (impermeable, moderate, free flow)

Moderate

25

Distance from the aquifer (>10m, 2-10m, <2m, in the aquifer)

>10 m

26

Site Distance from:

S

27

Settlements, schools, working places

250 m from Muhammad gate new constructive buildings, 3.3 km from school, 250 m from working places (markets etc.)

28

Stream with permanent flow

No

29

Forest

No

30

Agricultural activities, pastures

No

31

Wells / boreholes

650 m from oil field boreholes

32

Sea shore

7.6 km

33

Other (describe)

60 m from Sharin Gol Lake

34

Existing infrastructure

No infrastructure

35

Fencing

No

36

Guard-house

No

37

Lining or collection of leachate

No

38

Fire safety measures - fire belt

No

39

Other (describe)




40

Nuisances and Hazards

No

41

Odors and dust

Yes

42

Wind blown materials

No

43

Birds, rats, vermin, insects

No

44

Fires

No

45

Rainfall values (<100mm, 100-200mm, >200mm)

< 100 mm

46

Stream flow (if applicable) through the site

No

47

Flood potential (1 in 10yrs, 1 in 50, 1 in 100)

1 in 100 yrs

48

Use of the receptor (no use, irrigation, drinking-recreation)

Lake with no use and, aquifer

49

Sensitivity of the receptor (low, medium, high)

Low, high

50

Expected impacts on the environment (e.g. odours, pollution of receptors, fires etc)

Almost negligible

51

Other information

By the termination of the construction works the site must be closed and waste must be transported



Photograph 36: Site 41