The ministry of economic development of the republic of azerbaijan rehabilitation and closure of unauthorized dump sites in the greater baku area environmental



Download 4.64 Mb.
Page79/82
Date06.08.2017
Size4.64 Mb.
#27742
1   ...   74   75   76   77   78   79   80   81   82

1.66Site 78




Unauthorised Dumpsites Questionnaire - Greater Baku Area




Dumpsite Code

78




Person who conducted the survey

Prof. dr. Theologos Mimides




Date of the survey

31/3/2011

1

Name of dumpsite

Mastaga

2

Coordinates

40°31'47.99"N

50° 1'19.30"E



3

Settlements which use the dumpsite

Mastaga

4

Municipality (-ies) or local authority (-ies) which use the dumpsite

Sabunchu

5

General description of the situation in the dumpsite

A dumpsite inside an urban area where household waste predominates

6

Total years of operation of the dumpsite

2

7

Date of initiation

2009

8

Date of closure

-

9

Years after closure (<15, 15< and <40, >40)

-

10

Area of dumpsite (in 1.000m2)

400 m2

11

Type of waste disposed (define with percentages)

80% household, 20% debris

12

Municipal waste, wastewater treatment sludge, sewage water

Yes, no, no

13

Inert and bulky

Yes

14

Green and agricultural

No

15

Medical waste, toxic waste, slaughter house waste

No, no, no

16

Other (describe)

-

17

Total volume (m3)

200 m3

18

Total quantity (tn)

60 tn

19

Disposal method (describe: dispersion, incineration, compaction, temporary cover frequency)

Deposition

20

Quantity of gas generated

No

21

Bedrock (main formation)

Limestone with sands,

(middle Quaretenary), aquifer



22

Morphology of area (stream, valley, mountainside, level area, pit, quarry, other)

Flat urban area

23

Hydraulic conductivity of capping (impermeable, moderate, free flow)

-

24

Hydraulic conductivity of bedrock (impermeable, moderate, free flow)

Free flow

25

Distance from the aquifer (>10m, 2-10m, <2m, in the aquifer)

< 2m

26

Site Distance from:




27

Settlements, schools, working places

< 20m, 1.5 km, 200m

28

Stream with permanent flow

No

29

Forest

No

30

Agricultural activities, pastures

No, no

31

Wells / boreholes

No

32

Sea shore

6 km

33

Other (describe)

Next to the railway line

34

Existing infrastructure

Water and gas pipe

35

Fencing

Yes

36

Guard-house

No

37

Lining or collection of leachate

No

38

Fire safety measures - fire belt

No

39

Other (describe)

-

40

Nuisances and Hazards

Yes

41

Odors and dust

Yes

42

Wind blown materials

Yes

43

Birds, rats, vermin, insects

No

44

Fires

No

45

Rainfall values (<100mm, 100-200mm, >200mm)

50 mm

46

Stream flow (if applicable) through the site

No

47

Flood potential (1 in 10yrs, 1 in 50, 1 in 100)

1 in 100 yrs

48

Use of the receptor (no use, irrigation, drinking-recreation)

No use

49

Sensitivity of the receptor (low, medium, high)

Medium

50

Expected impacts on the environment (e.g. odours, pollution of receptors, fires etc)

Medium

51

Other information

Waste has to be removed




Photograph 77: Site 78



Download 4.64 Mb.

Share with your friends:
1   ...   74   75   76   77   78   79   80   81   82




The database is protected by copyright ©ininet.org 2024
send message

    Main page