The ministry of economic development of the republic of azerbaijan rehabilitation and closure of unauthorized dump sites in the greater baku area environmental


ANNEX 3. THE RESULTS OF RISK ASSESSMENT



Download 4.64 Mb.
Page14/82
Date06.08.2017
Size4.64 Mb.
#27742
1   ...   10   11   12   13   14   15   16   17   ...   82

ANNEX 3. THE RESULTS OF RISK ASSESSMENT



QUESTIONNAIRES OF UNAUTHORIZED DUMP SITES
CONTENTS

ANNEX 2. ECOLOGICAL MONITORING STANDARDS 129

ANNEX 2A. REQUIREMENTS FOR WASTE WATER CONTENT 129

ANNEX 3. THE RESULTS OF RISK ASSESSMENT 144

1 QUESTIONNAIRES OF UNAUTHORIZED DUMP SITES 1

1.1 Site 1 1

1.2 Site 2 3

1.3 Site 3 5

1.4 Site 4 7

1.5 Site 5 9

1.6 Site 6 11

1.7 Site 7 13

1.8 Site 8 15

1.9 Site 9 17

1.10 Site 10 19

1.11 Site 11 20

1.12 Site 12 23

1.13 Site 13 25

1.14 Site 14 27

1.15 Site 16 29

1.16 Site 17 31

1.17 Site 19 33

1.18 Site 20 35

1.19 Site 21 37

1.20 Site 22 39

1.21 Site 23 41

1.22 Site 25 43

1.23 Site 27 45

1.24 Site 28 47

1.25 Site 29 49

1.26 Site 30 51

1.27 Site 31 53

1.28 Site 32 55

1.29 Site 33 57

1.30 Site 34 59

1.31 Site 35 61

1.32 Site 36 63

1.33 Site 37 65

1.34 Site 38 67

1.35 Site 39 69

1.36 Site 41 71

1.37 Site 42 73

1.38 Site 46 75

1.39 Site 47 77

1.40 Site 48 79

1.41 Site 49 81

1.42 Site 50 83

1.43 Site 51 85

1.44 Site 52 87

1.45 Site 53 89

1.46 Site 55 91

1.47 Site 56 93

1.48 Site 57 95

1.49 Site 58 97

1.50 Site 59 99

1.51 Site 60 101

1.52 Site 61 102

1.53 Site 62 105

1.54 Site 63 107

1.55 Site 64 109

1.56 Site 65 111

1.57 Site 66 113

1.58 Site 67 115

1.59 Site 69 117

1.60 Site 71 119

1.61 Site 72 121

1.62 Site 73 123

1.63 Site 75 125

1.64 Site 76 127

1.65 Site 77 129

1.66 Site 78 131

ANNEX 4. ENVIRONMENTAL AND SOCIAL MANAGEMENT PLAN 222

ANNEX 5. THE MINUTES OF THE PUBLIC DISCUSSIONS 222

1QUESTIONNAIRES OF UNAUTHORIZED DUMP SITES

1.1Site 1




Unauthorised Dumpsites Questionnaire - Greater Baku Area




Dumpsite Code

1




Person who conducted the survey

Prof. Dr. Theologos Mimidis




Date of the survey

22/02/11

1

Name of dumpsite

Lokbatan ravine

2

Coordinates

40 19 30.8

49 44 40.6



3

Settlements which use the dumpsite

East Lokbatan settlements

4

Municipality (-ies) or local authority (-ies) which use the dumpsite

Municipality of Garadagh

5

General description of the situation in the dumpsite

Household waste are thrown along the slope of the ravine with dips reaching 60o

6

Total years of operation of the dumpsite

3 years

7

Date of initiation

2008

8

Date of closure

Still operating

9

Years after closure (<15, 15< and <40, >40)

-

10

Area of dumpsite (in 1.000m2)

20 m x 20 m = 400 m2

11

Type of waste disposed (define with percentages)

95% household waste, 5% construction and rubble. (M)

12

Municipal waste, wastewater treatment sludge, sewage water

Only municipal waste

13

Inert and bulky

Yes

14

Green and agricultural

No

15

Medical waste, toxic waste, slaughter house waste

No

16

Other (describe)

Rubble, mainly debris

17

Total volume (m3)

400 m2 x 0.30 m = 120 m3

18

Total quantity (tn)

40 tn

19

Disposal method (describe: dispersion, incineration, compaction, temporary cover frequency)

Dispersion, no cover, sometimes auto-ignited

20

Quantity of gas generated

No gas

21

Bedrock (main formation)

Clay loam, silt, fine grained sand, modern aquifer

22

Morphology of area (stream, valley, mountainside, level area, pit, quarry, other)

Ravine with steep slopes

23

Hydraulic conductivity of capping (impermeable, moderate, free flow)

No capping

24

Hydraulic conductivity of bedrock (impermeable, moderate, free flow)

Moderate

25

Distance from the aquifer (>10m, 2-10m, <2m, in the aquifer)

< 2 m

26

Site Distance from:

S

27

Settlements, schools, working places

5 m, 485 m, 300 m

28

Stream with permanent flow

No

29

Forest

No

30

Agricultural activities, pastures

No

31

Wells / boreholes

No

32

Sea shore

3,550 m

33

Other (describe)

2.5 km from New Sederek Trade Centre

34

Existing infrastructure

Residential new area with gas, and supply of potable water pipes and sewerage system.

35

Fencing

No

36

Guard-house

No

37

Lining or collection of leachate

No

38

Fire safety measures - fire belt

No

39

Other (describe)

Industrial premices at a distance of 400 meters

40

Nuisances and Hazards

Yes

41

Odors and dust

Yes

42

Wind blown materials

Yes

43

Birds, rats, vermin, insects

Yes

44

Fires

Sometimes

45

Rainfall values (<100mm, 100-200mm, >200mm)

100 – 250 mm

46

Stream flow (if applicable) through the site

No flow

47

Flood potential (1 in 10yrs, 1 in 50, 1 in 100)

1 in 50 yrs

48

Use of the receptor (no use, irrigation, drinking-recreation)

Aquifer not in use

49

Sensitivity of the receptor (low, medium, high)

Medium

50

Expected impacts on the environment (e.g. odours, pollution of receptors, fires etc)

Medium

51

Other information

Children playgrounds




Photograph 1: Site 1



Download 4.64 Mb.

Share with your friends:
1   ...   10   11   12   13   14   15   16   17   ...   82




The database is protected by copyright ©ininet.org 2024
send message

    Main page