|
Dumpsite Code
|
1
|
|
Person who conducted the survey
|
Prof. Dr. Theologos Mimidis
|
|
Date of the survey
|
22/02/11
|
1
|
Name of dumpsite
|
Lokbatan ravine
|
2
|
Coordinates
|
40 19 30.8
49 44 40.6
|
3
|
Settlements which use the dumpsite
|
East Lokbatan settlements
|
4
|
Municipality (-ies) or local authority (-ies) which use the dumpsite
|
Municipality of Garadagh
|
5
|
General description of the situation in the dumpsite
|
Household waste are thrown along the slope of the ravine with dips reaching 60o
|
6
|
Total years of operation of the dumpsite
|
3 years
|
7
|
Date of initiation
|
2008
|
8
|
Date of closure
|
Still operating
|
9
|
Years after closure (<15, 15< and <40, >40)
|
-
|
10
|
Area of dumpsite (in 1.000m2)
|
20 m x 20 m = 400 m2
|
11
|
Type of waste disposed (define with percentages)
|
95% household waste, 5% construction and rubble. (M)
|
12
|
Municipal waste, wastewater treatment sludge, sewage water
|
Only municipal waste
|
13
|
Inert and bulky
|
Yes
|
14
|
Green and agricultural
|
No
|
15
|
Medical waste, toxic waste, slaughter house waste
|
No
|
16
|
Other (describe)
|
Rubble, mainly debris
|
17
|
Total volume (m3)
|
400 m2 x 0.30 m = 120 m3
|
18
|
Total quantity (tn)
|
40 tn
|
19
|
Disposal method (describe: dispersion, incineration, compaction, temporary cover frequency)
|
Dispersion, no cover, sometimes auto-ignited
|
20
|
Quantity of gas generated
|
No gas
|
21
|
Bedrock (main formation)
|
Clay loam, silt, fine grained sand, modern aquifer
|
22
|
Morphology of area (stream, valley, mountainside, level area, pit, quarry, other)
|
Ravine with steep slopes
|
23
|
Hydraulic conductivity of capping (impermeable, moderate, free flow)
|
No capping
|
24
|
Hydraulic conductivity of bedrock (impermeable, moderate, free flow)
|
Moderate
|
25
|
Distance from the aquifer (>10m, 2-10m, <2m, in the aquifer)
|
< 2 m
|
26
|
Site Distance from:
|
S
|
27
|
Settlements, schools, working places
|
5 m, 485 m, 300 m
|
28
|
Stream with permanent flow
|
No
|
29
|
Forest
|
No
|
30
|
Agricultural activities, pastures
|
No
|
31
|
Wells / boreholes
|
No
|
32
|
Sea shore
|
3,550 m
|
33
|
Other (describe)
|
2.5 km from New Sederek Trade Centre
|
34
|
Existing infrastructure
|
Residential new area with gas, and supply of potable water pipes and sewerage system.
|
35
|
Fencing
|
No
|
36
|
Guard-house
|
No
|
37
|
Lining or collection of leachate
|
No
|
38
|
Fire safety measures - fire belt
|
No
|
39
|
Other (describe)
|
Industrial premices at a distance of 400 meters
|
40
|
Nuisances and Hazards
|
Yes
|
41
|
Odors and dust
|
Yes
|
42
|
Wind blown materials
|
Yes
|
43
|
Birds, rats, vermin, insects
|
Yes
|
44
|
Fires
|
Sometimes
|
45
|
Rainfall values (<100mm, 100-200mm, >200mm)
|
100 – 250 mm
|
46
|
Stream flow (if applicable) through the site
|
No flow
|
47
|
Flood potential (1 in 10yrs, 1 in 50, 1 in 100)
|
1 in 50 yrs
|
48
|
Use of the receptor (no use, irrigation, drinking-recreation)
|
Aquifer not in use
|
49
|
Sensitivity of the receptor (low, medium, high)
|
Medium
|
50
|
Expected impacts on the environment (e.g. odours, pollution of receptors, fires etc)
|
Medium
|
51
|
Other information
|
Children playgrounds
|