The ministry of economic development of the republic of azerbaijan rehabilitation and closure of unauthorized dump sites in the greater baku area environmental



Download 4.64 Mb.
Page22/82
Date06.08.2017
Size4.64 Mb.
#27742
1   ...   18   19   20   21   22   23   24   25   ...   82

1.9Site 9




Unauthorised Dumpsites Questionnaire - Greater Baku Area




Dumpsite Code

9




Person who conducted the survey

Dr Theologos Mimidis




Date of the survey

18th January 2011

1

Name of dumpsite

Lokbatan, Bina Shopping Center

2

Coordinates

40 17 59.5

49 44 53.4



3

Settlements which use the dumpsite

Shopping centers around the dumpsite

4

Municipality (-ies) or local authority (-ies) which use the dumpsite

Municipality of Garadagh

5

General description of the situation in the dumpsite

Located beside shopping center and developed in a dispersed and diffuse manner along the shores of nearby lake with formation waters, hydrocarbons and oil spills

6

Total years of operation of the dumpsite

8

7

Date of initiation

1993

8

Date of closure

It is not closed and still is fully operating

9

Years after closure (<15, 15< and <40, >40)

-

10

Area of dumpsite (in 1.000m2)

1000 m x 30 m = 30,000 m2

11

Type of waste disposed (define with percentages)

Mainly bags, carton boxes, containers, wrapping materials, broken goods. 70% plastics, 20% cartons, 3% ceramics and porcelains, 2% wood, 5% textiles, fabrics, woven, etc. (I)

12

Municipal waste, wastewater treatment sludge, sewage water

No

13

Inert and bulky

One month ago everything was bulky and very high. Now waste is compressed and the general picture gives the impression of a flat dump area. All waste materials are inert.

14

Green and agricultural

No

15

Medical waste, toxic waste, slaughter house waste

No

16

Other (describe)

Mainly shopping center refuge

17

Total volume (m3)

30,000 m2 x 1.20 m = 36,000 m3

18

Total quantity (tn)

12,000 tn

19

Disposal method (describe: dispersion, incineration, compaction, temporary cover frequency)

Mainly dispersion and compaction once a month

20

Quantity of gas generated

No gas is generated. 100% inert materials

21

Bedrock (main formation)

Intercalations of limestone and sand into clays, Upper Pliocene

22

Morphology of area (stream, valley, mountainside, level area, pit, quarry, other)

Flat area adjacent to a lake where formation waters and groundwaters are collected. The age of the lake is 60 – 70 years.

23

Hydraulic conductivity of capping (impermeable, moderate, free flow)

During operation solid waste was not covered by earthy materials. Capping does not exist.

24

Hydraulic conductivity of bedrock (impermeable, moderate, free flow)

Moderate

25

Distance from the aquifer (>10m, 2-10m, <2m, in the aquifer)

< 2 m

26

Site Distance from:

C

27

Settlements, schools, working places

No settlements, no schools, only working places and shopping centers.

28

Stream with permanent flow

No

29

Forest

No

30

Agricultural activities, pastures

No

31

Wells / boreholes

No

32

Sea shore

880 m from the Caspian sea shore line.

33

Other (describe)

Around the dumpsite exist two big shopping centers and two to three small.

34

Existing infrastructure

The city of Lokbatan at 3.37 Km. Also 45 m from shopping center premices and 0 m from the lake.

35

Fencing

No

36

Guard-house

Yes

37

Lining or collection of leachate

No

38

Fire safety measures - fire belt

Yes

39

Other (describe)

Littering from transported wastes of the main roads leading to the shopping centers.

40

Nuisances and Hazards

Nuisance: air transported materials into the lake. Hazards: No.

41

Odors and dust

Yes

42

Wind blown materials

Problems with air blown plastic bags.

43

Birds, rats, vermin, insects

Yes, especially during spring and summer seasons.

44

Fires

No

45

Rainfall values (<100mm, 100-200mm, >200mm)

100 – 250 mm

46

Stream flow (if applicable) through the site

No

47

Flood potential (1 in 10yrs, 1 in 50, 1 in 100)

1 in 10 yrs

48

Use of the receptor (no use, irrigation, drinking-recreation)

Aquifuge with no use

49

Sensitivity of the receptor (low, medium, high)

High

50

Expected impacts on the environment (e.g. odours, pollution of receptors, fires etc)

Water pollution, extinction of water life in the lake

51

Other information

Reclaiming land from the lake to build new shopping centers.




Photograph 9: Site 9


Download 4.64 Mb.

Share with your friends:
1   ...   18   19   20   21   22   23   24   25   ...   82




The database is protected by copyright ©ininet.org 2024
send message

    Main page