1.8Site 8




Unauthorised Dumpsites Questionnaire - Greater Baku Area




Dumpsite Code

8




Person who conducted the survey

Prof. Dr. Theologos Mimidis




Date of the survey

23/02/11

1

Name of dumpsite

North part of Shikh beach, nearby Shahin ridge quarries

2

Coordinates

40 18 29,3

49 46 53,3



3

Settlements which use the dumpsite

Lokbatan, Sabail

4

Municipality (-ies) or local authority (-ies) which use the dumpsite

Municipality of Garadagh

5

General description of the situation in the dumpsite

It is located nearby Chich beach and very close to a fossiliferous limestone quarry, where building stones are extracted

6

Total years of operation of the dumpsite

10

7

Date of initiation

2001

8

Date of closure

Still operating

9

Years after closure (<15, 15< and <40, >40)

-

10

Area of dumpsite (in 1.000m2)

200 m x 200 m = 40,000 m2

11

Type of waste disposed (define with percentages)

70% construction and demolition, 20 debris and quarry tailings, 10% domestic waste (H)

12

Municipal waste, wastewater treatment sludge, sewage water

Construction municipal wastes

13

Inert and bulky

Yes

14

Green and agricultural

No

15

Medical waste, toxic waste, slaughter house waste

No

16

Other (describe)

Active extraction works

17

Total volume (m3)

40,000 m2 x 1,5 m = 60,000 m3

18

Total quantity (tn)

20,000 tn

19

Disposal method (describe: dispersion, incineration, compaction, temporary cover frequency)

Transported mainly by tracks and deposited in piles

20

Quantity of gas generated

No gas

21

Bedrock (main formation)

Intercalations of limestone and sand in clays formations of Upper Pliocene age

22

Morphology of area (stream, valley, mountainside, level area, pit, quarry, other)

Moderate hilly and flat area with active excavating quarry works taking place

23

Hydraulic conductivity of capping (impermeable, moderate, free flow)

Partially capped

24

Hydraulic conductivity of bedrock (impermeable, moderate, free flow)

Moderate

25

Distance from the aquifer (>10m, 2-10m, <2m, in the aquifer)

<2 m

26

Site Distance from:

I

27

Settlements, schools, working places

120 m, 1.2 Km, 200m

28

Stream with permanent flow

No

29

Forest

No

30

Agricultural activities, pastures

No

31

Wells / boreholes

No

32

Sea shore

600 m

33

Other (describe)

Quarry tailings has to be managed rationally

34

Existing infrastructure

Shahin Garden Ridge quarries

35

Fencing

Stonewalls

36

Guard-house

No

37

Lining or collection of leachate

No

38

Fire safety measures - fire belt

No

39

Other (describe)

Among the 15 biggest dumpsites

40

Nuisances and Hazards

Yes

41

Odors and dust

Yes

42

Wind blown materials

No

43

Birds, rats, vermin, insects

No

44

Fires

No

45

Rainfall values (<100mm, 100-200mm, >200mm)

100 – 250 mm

46

Stream flow (if applicable) through the site

No

47

Flood potential (1 in 10yrs, 1 in 50, 1 in 100)

1 in 100 years

48

Use of the receptor (no use, irrigation, drinking-recreation)

Aquifuge with no use

49

Sensitivity of the receptor (low, medium, high)

High

50

Expected impacts on the environment (e.g. odours, pollution of receptors, fires etc)

Dust

51

Other information

Danger to respiratory system of locals from breathing dust



Photograph 8: Site 8


Download 4.64 Mb.

Share with your friends:
1   ...   17   18   19   20   21   22   23   24   ...   82




The database is protected by copyright ©ininet.org 2024
send message

    Main page